• No results found

Operational measures for board process variables

Gaussian process power curve models incorporating wind turbine operational variables

Gaussian process power curve models incorporating wind turbine operational variables

... several operational variables (such as rotor speed and blade pitch angle) and incorporating these could improve overall accuracy and fault detection ...Gaussian Process (GP), a machine learning, ...

12

Standard Operating Procedures. for repeated measures of process and state variables of coral reef environments

Standard Operating Procedures. for repeated measures of process and state variables of coral reef environments

... The belt-transect method provides more of a rapid assessment of state variables while monitoring individual colonies provides detailed information for a limited number of colonies. Coupling rapid assessments and ...

36

Towards operational measures of computer security

Towards operational measures of computer security

... For the security ‘process’, where we are trying to model the process that results from intentional attacks, it is not obvious what should play the role of time in order to capture the notion of stress. ...

25

A measurement model to link process operational measures to risks associated with attainment of business critical success factors

A measurement model to link process operational measures to risks associated with attainment of business critical success factors

... 5.2 Contribution to Theory The research provides a structure and synthesis to the academic literature in the field of ITSM. We present a comprehensive and empirically validated conceptualization of the factors pertaining ...

20

Latent variable modeling and its implications for institutional review board review: variables that delay the reviewing process

Latent variable modeling and its implications for institutional review board review: variables that delay the reviewing process

... Study data We surveyed 221 proposals, including human studies, which were submitted to our IRB over a 5-year period. Proposals for which the application was withdrawn be- fore completion of the review were excluded. The ...

7

Towards Operational Measures of Computer Security: Experimentation and Modelling

Towards Operational Measures of Computer Security: Experimentation and Modelling

... normal operational use and those which result from intentional attacks upon the ...the process of security breaches could be modelled ...intrusion process, as discussed ...

22

Operational Process Innovation : improving the fit between operational process and competitive flexibility at GM the Furniture Factory

Operational Process Innovation : improving the fit between operational process and competitive flexibility at GM the Furniture Factory

... current situation, several buffer inventories are created between the processes. One of these buffers is a clustering on colour, extending the throughput time with another week. This makes the total throughput time 7 ...

74

Investigating and Optimizing the Process Variables
  Related to the Tensile Properties of Short Jute Fiber
  Reinforced with Polypropylene Composite Board

Investigating and Optimizing the Process Variables Related to the Tensile Properties of Short Jute Fiber Reinforced with Polypropylene Composite Board

... Manufacturing of Composite Boards Mixing of Jute fiber with polypropylene (ratio 1:1) was done homogenously by manual blending. After the mixing the fibers, they were passed through a miniature carding machine four times ...

7

Identification of Influencing Variables of Demand oriented Measures for Volume Flexibility

Identification of Influencing Variables of Demand oriented Measures for Volume Flexibility

... A new structural linkage of existing work systems on the material flow can exemplify that. In practice, manufacturing companies often miss the moment of switching their job-shop production to a flow line system or the ...

6

The use of cognitive ability measures as explanatory variables in regression analysis

The use of cognitive ability measures as explanatory variables in regression analysis

... The process inevitably involves the interplay of defining and refining the construct to be measured, designing test items to measure it, defining a space of responses and scoring rules for each possible response ...

19

An application of fuzzy-AHP to ship operational energy efficiency measures

An application of fuzzy-AHP to ship operational energy efficiency measures

... ship operational energy efficiency than other main ...on- board ship constitute small parts of the total fuel consumption compared to the contribution from ...

19

An application of fuzzy-AHP to ship operational energy efficiency measures

An application of fuzzy-AHP to ship operational energy efficiency measures

... ship operational energy efficiency than other main ...on- board ship constitute small parts of the total fuel consumption compared to the contribution from ...

20

Chapter10.Standard-Costing-Operational-Performance-Measures-and-the-Balanced-Scorecard.pdf

Chapter10.Standard-Costing-Operational-Performance-Measures-and-the-Balanced-Scorecard.pdf

... Answer: While a connection between these variances cannot be guaranteed, the following scenario is plausible. Better-than-standard quality materials were purchased, leading to an unfavorable materials price variance. ...

36

Barriers to uptake of energy efficient operational measures: Survey Report

Barriers to uptake of energy efficient operational measures: Survey Report

... The unit of analysis/target population were global shipping companies with more than 5 ships which consisted of shipowners, ship owner-operators, ship management company & shipping division major charterers/cargo owners ...

37

Credit operational process of United Finance Limited

Credit operational process of United Finance Limited

... 4.4.6 Post‐facto Risk Management There has been further development in portfolio risk analysis and early warning system. Innovative analytical system has been developed that allows us to understand probable future risks ...

51

Operational Performance Measures for Two-lane Roads: An Assessment of Methodological Alternatives

Operational Performance Measures for Two-lane Roads: An Assessment of Methodological Alternatives

... other measures were also considered, namely, percent followers, follower density, and ratio of average travel speed to free-flow speed, and their relationships were investigated by using regression ...geometric ...

9

CRITICAL PROCESS VARIABLES

CRITICAL PROCESS VARIABLES

... and universities, especially change introduced by a searching self study..  We’ll treat planned change and self study as roughly.[r] ...

28

Board of Directors Operational Update

Board of Directors Operational Update

... On-board Medicaid providers to connect to Hawai`i HIE’s Health e Net (CHR and Referral System) and subsequently successfully exchange data and uses Hawai`i HIE’s services to meet Mean[r] ...

20

Operational Evaluation Board Report

Operational Evaluation Board Report

... Most operational evaluations were conducted jointly by integrated teams composed of TCCA, FAA and JAA/EASA ...evaluation process to produce a report specific to its particular requirements that, while ...

33

Business Process Measures

Business Process Measures

... employee or resource is necessary to perform the task. Control flows are shown by simple arrowed lines, and rectangles represent objects in object flows – either flows of messages (e.g. Order) or physical objects (e.g. ...

12

Show all 10000 documents...

Related subjects