1000 MW
Seismic Qualification of Bubbler at WWER-1000 MW Type NPP
7
Aging Problems and Residual Life Time Evaluation of the WWER-1000 MW Containment Shell Structure
8
Seismic Response Analyses of Turbine Hall and Electrical Building of RBMK-1000 MW Type NPP (K018)
9
Seismic Qualification of Heatexchanger at WWER-1000 MW Type NPP
8
Performance Analysis of Induced Draft Fan Driven by Steam Turbine for 1000 MW Power Units
6
Investigations of a Long-Distance 1000 MW Heat Transport System with APROS Simulation Software
10
Calculation of Thermal Stress and Fatigue Life of 1000 MW Steam Turbine Rotor
6
Soil-Structure Interaction Analysis Of RBMK-1000 MW Type NPP For Seismic Event
8
Assessment of tradable short-term transmission access rights to integrate renewable generation
5
A four quadrant adjustable speed drive for series wound DC motors
152
An Improved System for Utilizing Low-temperature Waste Heat of Flue Gas from Coal-Fired Power Plants
17
Electrical energy monthly bulletin 5 1985
18
Electrical energy monthly bulletin 5 1984
16
The 2010 Annual Economic Report on the European Fishing Fleet EUR 24554 EN
690
brlReport1115 1000 pdf
100
ENO morphological wavelet and its application in image processing
6
IEC 61850-based islanding detection and load shedding in substation automation systems
16
FAST DISSVOLVING DRUG DELIVERY SYSTEM : A REVIEW
19
Cutting emissions in the energy sector: a technological and regulatory perspective
13
INHIBITION OF THIOACETAMIDE INDUCED LIVER FIBROSIS BY PIPER NIGRUM LINN
6