• No results found

runoff and sediment yield

Evaluation Of ANN, M5P, RBF, Reptree For Runoff And Sediment Yield

Evaluation Of ANN, M5P, RBF, Reptree For Runoff And Sediment Yield

... the Runoff- Sediment modelling , ANN, RBF, REPTree and M5P models have been developed to predict the Runoff and Sediment Yield on the monthly basis data of rainfall ,temperature, wind ...

7

Simulation of Runoff and Sediment Yield for a Himalayan Watershed Using SWAT Model

Simulation of Runoff and Sediment Yield for a Himalayan Watershed Using SWAT Model

... The data of an intermediate watershed of Satluj river was used for assessment of runoff and sediment yield in the present study. The study watershed (Figure 1) lying be- tween Suni to Kasol in the ...

15

Ratio of basin lag times for runoff and sediment yield processes recorded in various environments

Ratio of basin lag times for runoff and sediment yield processes recorded in various environments

... storm runoff hydrograph, is an important factor in determining the time to peak and the peak value of the instantaneous unit hydrograph ...(suspended sediment load as a function of time), the equivalent ...

7

Simulation of Runoff and Sediment Yield for a Kaneri Watershed Using SWAT Model

Simulation of Runoff and Sediment Yield for a Kaneri Watershed Using SWAT Model

... Watershed as an entry point acts as a beginning to address the issues of sustainable rainwater management for improving livelihoods. Extraction of watershed parameters using Geographical Information System (GIS) and use ...

15

Runoff and sediment yield modeling using WEPP in a semi-arid environment (Case study: Orazan Watershed)

Runoff and sediment yield modeling using WEPP in a semi-arid environment (Case study: Orazan Watershed)

... In this study the prediction capabilities of WEPP was tested on a semi-arid catchment from 1996 to 2005. Results showed that annual sediment yield and Runoff outputs are relatively well predicted. ...

8

Application of Soil and Water Assessment Tool Model to Estimate Runoff and Sediment Yield from Mojo Watershed

Application of Soil and Water Assessment Tool Model to Estimate Runoff and Sediment Yield from Mojo Watershed

... The total available water estimated from the watershed is 530.8 M m 3 per year out of this 115.248 M m 3 is required for domestic and livestock use of which agricultural water demand takes the lion’s share with about ...

11

Hydrological heterogeneity in Mediterranean reclaimed slopes: runoff and sediment yield at the patch and slope scales along a gradient of overland flow

Hydrological heterogeneity in Mediterranean reclaimed slopes: runoff and sediment yield at the patch and slope scales along a gradient of overland flow

... of runoff and sediments col- lected down slope from the ...low runoff and sediment yield rates were relatively constant in these patches, even under high precipitation or intense rain- fall ...

16

Contrasting watershed scale trends in runoff and sediment yield complicate  rangeland water resources planning

Contrasting watershed scale trends in runoff and sediment yield complicate rangeland water resources planning

... rainfall, runoff, and sed- iment yield in rangeland watersheds with a dynamic land use ...increase runoff by directing land cover ...ment yield is related to long-term landscape changes and an ...

13

MORPHOMETRIC AND RUNOFF ANALYSIS INCLUDING SOIL EROSION AND SEDIMENT YIELD ESTIMATION OF UPPER-HELMAND RIVER BASIN AFGHANISTAN

MORPHOMETRIC AND RUNOFF ANALYSIS INCLUDING SOIL EROSION AND SEDIMENT YIELD ESTIMATION OF UPPER-HELMAND RIVER BASIN AFGHANISTAN

... and runoff analysis including soil erosion and sediment yield estimation of Upper - Helmand River Basin of ...the runoff estimation, SCS-CN (Curve Number) method with Arc-GIS and remote ...

17

Can the water erosion prediction project model be used to estimate best management practice effectiveness from forest roads?

Can the water erosion prediction project model be used to estimate best management practice effectiveness from forest roads?

... The posterior parameter distributions for interrill erodibility, rill erodibility, and critical shear did not differ substantially from their prior distribution (i.e., a uniform distribution) (Figure 8). This is ...

10

Parameter evaluation for soil erosion estimation on small watersheds using SWAT model

Parameter evaluation for soil erosion estimation on small watersheds using SWAT model

... of runoff generation and soil loss (sediment yield) versus the corresponding erosive events are given in Table 4 for the calibration and validation ...surface runoff and soil ...to ...

13

Runoff and Sediment Modeling Using SWAT in Gumera Catchment, Ethiopia

Runoff and Sediment Modeling Using SWAT in Gumera Catchment, Ethiopia

... stream runoff and sediment ...and sediment load data of 1994 to 2002 and validated with the observed data from years 2003 to ...the runoff and sediment yield for the study ...

10

Evaluation of Spatial and Temporal Variability of Sediment Yield on Bilate Watershed, Rift Valley Lake Basin, Ethiopia

Evaluation of Spatial and Temporal Variability of Sediment Yield on Bilate Watershed, Rift Valley Lake Basin, Ethiopia

... Once watershed delineated, then HRU analysis takes place. HRU analysis requires soil, land use/cover and slope data and divides sub basin in to number of HRU with a unique soil, land use/cover and slope combination. ...

10

Suspended sediment yield and climate change in Kamchatka, Far East of Russia

Suspended sediment yield and climate change in Kamchatka, Far East of Russia

... water runoff and sediment yield in the ...water runoff and sediment yield fluctua- ...water runoff and sediment yield which is confirmed with precipitation ...

10

Predicting Mean Annual Runoff and Suspended Sediment Yield in Rural Watersheds in North Carolina

Predicting Mean Annual Runoff and Suspended Sediment Yield in Rural Watersheds in North Carolina

... The selected independent variables for predicting SSY were percent of watershed area upstream of ponds and percent of forest cover for the Coastal Plain (n= 12); watershed mean[r] ...

156

Physically Based Runoff and Sediment Modelling of Rawal Watershed

Physically Based Runoff and Sediment Modelling of Rawal Watershed

... as sediment yield. Total erosion is always greater than sediment yield due to sediment deposition during ...high sediment concentration in rivers and sediment deposition ...

11

Application of SWAT to Assess the Effects of Land Use Change in the Murchison Bay Catchment in Uganda

Application of SWAT to Assess the Effects of Land Use Change in the Murchison Bay Catchment in Uganda

... estimate sediment yield and nutrients loss from the Murchison Bay catchment as a result of land use ...upland sediment yield estimated from the catchment showed that, both have increased over ...

17

Effects of nano carbon on soil erosion and nutrient loss in a semi-arid loess region of Northwestern China

Effects of nano carbon on soil erosion and nutrient loss in a semi-arid loess region of Northwestern China

... Sediment yield (represented by TS in this study) in the control plot increased quickly and fluctuated dramatically during the experiment; it had the highest value at 20 min and then decreased sharply ...

8

Evaluation of the variability in runoff and sediment loss in successional fallow vegetation of Southern Nigeria

Evaluation of the variability in runoff and sediment loss in successional fallow vegetation of Southern Nigeria

... In Nigeria and other parts of Africa, agriculture – basically food crop cultivation – constitutes the stronghold of the economy. Large expanse of for- est is usually cleared to make way for food crop cultivation, and ...

6

Regionalising MUSLE factors for application to a data-scarce catchment

Regionalising MUSLE factors for application to a data-scarce catchment

... predicted sediment yield for South ...(2015) sediment yield results for the Mzimvubu River catchment were also used for comparison between model outputs as the Tsitsa River is a tributary of ...

6

Show all 10000 documents...

Related subjects