start-up phase
Start-up phase of a two-stage anaerobic co-digestion process: hydrogen and methane production from food waste and vinasse from ethanol industry
8
Performance of a Freeze Concentration Pilot Plant during the Start-Up Phase
5
Critical enabling conditions and challenges in the start up phase of an international new venture : a social entrepreneur's perspective
326
Lithium-ion Battery Remaining Useful Life Prediction Based on Exponential Smoothing and Particle Filter
15
Managing inventory and production capacity in start up firms
20
Power Cluster: an Efficient Clustering MAC Protocol for RF Rechargeable Wireless Sensor Networks
6
Simulation Study of Energetic Ion Driven Instabilities near the Lower Hybrid Resonance Frequency in a Plasma with Increasing Density
7
Follow-up to Council Resolution of 7 June 1984 on the contribution of local employment initiatives to combatting unemployment. Communication from the Commission to the Council. COM (86) 784 final/2, 9 February 1987
8
Can overseas migrants develop sustained entrepreneurship? Multiple case studies of Wenzhou migrants in Italy
23
Thermophilic Anaerobic Co-digestion of Swine Manure with Corn Stover for Biogas Production.
148
A High-Swing Class-C VCO with Amplitude Feedback Loop for Low Phase Noise and Robust Start-Up
10
START-UP INDIA, STAND-UP INDIA: INDIA TURNING INTO A START-UP HUB BY PROSPERING ENTREPRENEURIAL CULTURE DEEPAK KUMAR ADHANA MBA, LL.B. UGC NET JRF (MANAGEMENT) Research Scholar, Institute of Mgt. Studies & Research, M.D. University, Rohtak (INDIA)
17
The Role of Technological Innovation in Start Up Performance: The Case of Start Up Firms in Ba Ria Vung Tau Province
9
Effect of Transient Heat Transfer of a Condenser on a Cascade Heat Pump Performance
13
Hamanasi Eco-Resort: Examining the Profit, Planet, and People Bottom Lines of Sustainability, Kate Early
8
Title : SMART AGRO – INDUSTRIAL AUTOMATION Author (s) : K.Sangeetha, K.S.SreeVishnu, S.Vibhu, S.Vikram, K.M.Shivashankar
6
Refbacks
11
A better start implementation evaluation workstream Report 2 learning from the grant set up phase
52
Reflection in large IT Projects : a method for project success focussing on soft factors
36
phase of the swimming start
232