Two-machine Flow Shop with Preventive Maintenance 31
Heuristic algorithms for two machine re-entrant flow shop
7
Minimizing Makespan with Start Time Dependent Jobs in a Two Machine Flow Shop
10
Algorithms for two-stage flow-shop with a shared machine in stage one and two parallel machines in stage two
96
The Two-machine Flow-shop Scheduling Problem with a Single Server and Unit Server Times
5
Heuristic for production scheduling on job-shop plants considering preventive maintenance tasks
8
Integrating preventive maintenance planning and production scheduling for a single machine
6
Agile Approach for Joint Scheduling of Production and Maintenance in Flow Shop
8
Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence
11
Mathematical optimization of a flexible job shop problem including preventive maintenance and availability of fixtures
10
Bottleneck based heuristic for three machine flow shop scheduling
38
Cyclic Hybrid Flow-shop Scheduling Problem with Machine Setups
10
Two meta-heuristic algorithms for solving multi-objective flexible job-shop scheduling with parallel machine and maintenance constraints
7
Optimization of an integrated batch production and maintenance scheduling on flow shop with two machines Pages 225-238 Download PDF
14
Bi objective Optimization Model for Integrated Preventive Maintenance and Flexible Job shop Scheduling Problem
8
A new proactive-reactive approach to hedge against uncertain processing times and unexpected machine failures in the two-machine flow shop scheduling problems
14
Approximation results for flow shop scheduling problems with machine availability constraints
15
Investigation of the two-machine flow shop scheduling problem to minimize total energy costs with time-dependent energy prices
16
Integrating Preventive Maintenance Scheduling as Probability Machine Failure and Batch Production Scheduling
8
(Max, +) Optimization Model for Scheduling Operations in a Flow Network with Preventive Maintenance Tasks
6
Predictive and Preventive Maintenance of Two and Three Wheeler Tube Defects in Splicing Process
9