channel throughput-delay analysis
Delay throughput analysis of multi channel MAC protocols in ad hoc networks
15
Performance analysis of DSRC priority mechanism for road safety applications in vehicular networks
10
Index Terms MANET, Fading Channel, Rician Fading, speed of nodes.
6
Throughput and delay analysis of LWA with bursty traffic and randomized flow splitting
13
MAC Sub Layer Analysis with Channel Estimation in Broadband Power Line Communication
8
Performance of voice over IP (VoIP) over a wireless LAN (WLAN) for different audio/voice codecs
21
Comprehensive Cross Layer Analysis Framework for Delay Distribution in WSN
10
Throughput and delay analysis of network coded ALOHA in wireless networks
15
Optimization Of K Means Clustering For DECT Using ACO
7
Fairness analysis of throughput and delay in WLAN environments with channel diversities
14
AN IMPROVED RECEIVER – CENTRIC MAC PROTOCOL FOR EFFECTIVE POWER MANAGEMENT IN WIRELESS SENSOR NETWORKS
5
An Evaluation of "Security Services" schemes For IEEE 802.11 Wireless LAN's Using Qualnet
6
Performance Analysis of DSR and AODV in Manets: Using WLAN Parameters
6
Performance Evaluation of Reactive, Proactive and Hybrid Routing Protocols in MANET Using OPNET Modeler
8
UWB [1]. THEREFORE UWB IS QUALIFIED FOR ENORMOUS FILE TRANSMISION IN WPAN E
5
TCP Vegas is the alternative
8
Transmission delay times of localized waves
9
Performance Analysis of VoIP Traffic in WiMAX using Various Service Classes
6
Performance Analysis of Backoff Exponent Behaviour at MAC Layer In ZigBee Sensor Networks
7
Combination of FIFO LRU cache replacement algorithms on proxy server to improve speed of response to object requests from clients
6