Flowshop scheduling problem
A Novel Variant of QGA with VNS for Flowshop Scheduling Problem
7
Appling Metaheuristic Algorithms on a Two Stage Hybrid Flowshop Scheduling Problem with Serial Batching (RESEARCH NOTE)
12
Bounds for the permutation flowshop scheduling problem with exact time lags to minimize the total earliness and tardiness
11
Multi-Objective Artificial Bee Colony Algorithms and Chaotic-TOPSIS Method for Solving Flowshop Scheduling Problem and Decision Making
22
Particle Swarm Optimization Algorithms for Two stage Hybrid Flowshop Scheduling Problem with No wait
15
A non-permutation flowshop scheduling problem with lot streaming: A Mathematical model Pages 507-516 Download PDF
10
Bounds for the Permutation Flowshop Scheduling Problem with Exact Time Lags while Minimizing the Total Earliness and Tardiness
6
Effective Hybrid Algorithms for No Wait Flowshop Scheduling Problem
6
Two machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times
12
A Reliability based Modelling and Optimization of an Integrated Production and Preventive Maintenance Activities in Flowshop Scheduling Problem
8
Lot Streaming in No-wait Multi Product Flowshop Considering Sequence Dependent Setup Times and Position Based Learning Factors
9
Dynamic weighted idle time heuristic for flowshop scheduling
48
A Branch and Bound Based Heuristic Algorithm for Minimizing Makespan in Machining Assembly Flowshop Scheduling
10
A two-agent scheduling problem in a two-machine flowshop Pages 289-306 Download PDF
18
No Wait Flowshops to Minimize Total Tardiness with Setup Times
8
M-machine, no-wait flowshop scheduling with sequence dependent setup times and truncated learning function to minimize the makespan Pages 309-322 Download PDF
14
Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
45
A neural network approach for machine breakdown repair time
25
Optimal Scheduling of Flowshop Batch Process for Zero Wait and No Intermediate Storage Transfer Policy
7
Multi-objective sequence dependent setup times hybrid flowshop scheduling: A literature review
53