Contractors perspective for critical factors of cost overrun in Highway Projects of Sindh, Pakistan

Contractors perspective for critical factors of cost overrun in Highway Projects of Sindh, Pakistan

... This research identified the cost overrun factors from contractor’s perspective in highway projects of Sindh Province. A total of 64 factors were identified from previous studies. After statistical ...

7

Causative factors of cost overrun in highway projects of Sindh
province of Pakistan

Causative factors of cost overrun in highway projects of Sindh province of Pakistan

... Delay in progress payment by owner/client was most causative factor with mean value 4.90. Mostly owner/client delay the payment process to the contractors and with this the construction activities at site mostly stop and ...

7

Performance of performance specifications in design-build highway projects

Performance of performance specifications in design-build highway projects

... for highway projects include shorter project duration through overlapping design and construction, higher productivity and more innovation introduced by contractors (Nyström, Nilsson and Lind, ...road ...

15

A Multi-Perspective Strategic Approach for the Selection of Contractor in Highway Projects

A Multi-Perspective Strategic Approach for the Selection of Contractor in Highway Projects

... In this study initially the need for an appropriate contractor selection is recognized. The major factors relating to selection of contractors are studied and analyzed. The factors are finalized based on the study of ...

6

Significant mitigation measures for critical factors of cost overrun in highway projects of Pakistan

Significant mitigation measures for critical factors of cost overrun in highway projects of Pakistan

... construction projects. According to [6], the construction projects do not perform as estimated in terms of ...construction projects fall victim to significant cost ...of highway ...

5

Residents' responses to proposed highway projects: Exploring the role of governmental information provision

Residents' responses to proposed highway projects: Exploring the role of governmental information provision

... proposed highway projects provided by governmental authorities ...those projects, the latter measured by expectations with regard to changes in residential ...of projects by information ...

23

Project viability framework for privatized highway projects in Malaysia

Project viability framework for privatized highway projects in Malaysia

... The present study combines qualitative and quantitative approaches to gather available data and material on the viability and profitability of privatised highway projects in Malaysia. The research will be ...

53

Factors Contributing to Successful Public Private Partnership Projects for Highway Projects in Indian Context

Factors Contributing to Successful Public Private Partnership Projects for Highway Projects in Indian Context

... PPP highway projects both public and private sectors should bring their expertise and skill to achieve better ...PPP projects irrespective of their geographical ...

5

Comparison of DB to DBB on highway projects in Washington State, USA

Comparison of DB to DBB on highway projects in Washington State, USA

... of highway projects of the same scope, size, and type could provide the basis to make the argument for the use of either DB or DBB on highway ...orders. Projects used for this research were ...

14

Predicting Preliminary Engineering Costs for Highway Projects.

Predicting Preliminary Engineering Costs for Highway Projects.

... The author reviewed journals, agency reports, academic research studies, and NCDOT documents to assess the status of PE cost estimating practices, factors influencing PE costs, and applicable analysis techniques. A ...

174

Negative Factors Adopting Public Private Partnership for Highway Projects: A Case Study of Gujarat

Negative Factors Adopting Public Private Partnership for Highway Projects: A Case Study of Gujarat

... PPP projects are usually long-term concession contracts, which the expenditure is clearly how the quality of service and measurable performance standards that indicate a direct relationship with the users of such ...

6

Design phase constructability concepts in highway projects

Design phase constructability concepts in highway projects

... 2.4 Maximum Benefit of Constructability 19 2.5 Constructability Concepts in Highway Projects 22 2.6 Design Phase Constructability Concepts 32 2.6.1 Carry Out Thorough Investigation of the Site 34 2.6.2 ...

24

Study of Regression Techniques on the Risk Modelling In Highway Projects Using Fault Tree Analysis & Recommendations for Rectification

Study of Regression Techniques on the Risk Modelling In Highway Projects Using Fault Tree Analysis & Recommendations for Rectification

... of Highway Projects in Taiwan” provides analytic procedures to recognize the risk allocation of construction projects and investigate the influence of risk allocation to contractor’s risk handling ...

9

Explaining cost overruns in highway projects : a geo spatial regression modelling and cognitive mapping of latent pathogens and contextual drivers

Explaining cost overruns in highway projects : a geo spatial regression modelling and cognitive mapping of latent pathogens and contextual drivers

... road projects in the Niger Delta region prepared at the pre-contract phases of highway projects?’ The case study approach thus has the potential to provide holistic answer to this research question ...

483

Time risk assessment framework for highway projects in Nigeria

Time risk assessment framework for highway projects in Nigeria

... on highway rehabilitation and construction ...of highway projects but could not provide the magnitude of risk factors on projects and are incapable of handling subjective risk data which are ...

72

Analysis of Environmental Impact Statements for Highway Projects in North Carolina

Analysis of Environmental Impact Statements for Highway Projects in North Carolina

... of projects, as the proportion of projects in the Coastal Plain increased after 1993, as mentioned before, and secondly because of differences in endangered species addressed, income, and wetlands ...

97

The Malaysian Public-Private Partnership (PPP): Financing the Tolled Highway Projects

The Malaysian Public-Private Partnership (PPP): Financing the Tolled Highway Projects

... cent. This ratio is examined in the Cost of Capital, as shown in Row #9 of Table 5. The sharp decline in the rate of return to the shareholders affected the overall cost of financing in 2002 (shown in Row #10 of Table ...

24

Highway Projects: Prices in Public Bids

Highway Projects: Prices in Public Bids

... Expert opinion using the proposed methodology was requested from the author and her team. The cost analysis of two sections of highway clearly showed incorrect cost estimates of the contracting authority. The ...

8

SCENARIO IN PUBLIC-PRIVATE PARTNERSHIP FOR HIGHWAY PROJECTS IN INDIA

SCENARIO IN PUBLIC-PRIVATE PARTNERSHIP FOR HIGHWAY PROJECTS IN INDIA

... PPP projects/ the authority/Agency appoints Independent consultant (IC) or Independent Engineer (IE), who has a team of independent Engineers/Experts supposed to be supervision the development and construction ...

10

Comprehensive risk management using fuzzy FMEA and MCDA
techniques in highway construction projects

Comprehensive risk management using fuzzy FMEA and MCDA techniques in highway construction projects

... particular, highway construction projects are subject to higher risks and uncertainties than other construction projects due to higher capital investments and more complexity and their dependency on ...

10

Show all 4324 documents...