• No results found

Toll Road

Performance Indicators Development for Toll Road Minimum Services Standards in Indonesia

Performance Indicators Development for Toll Road Minimum Services Standards in Indonesia

... of toll road MSS indicators in ...a Toll road MSS that is quite ...for toll road ...implementing Toll road MSS is part of the provided ...implementing Toll ...

11

Consumer acceptance of innovative toll road services : multi lane free flow (MLFF) system in Malaysia

Consumer acceptance of innovative toll road services : multi lane free flow (MLFF) system in Malaysia

... two toll collection systems for the Expressways, an “open” system and a “closed” ...the toll road ...for toll upon passing through a toll plaza. The toll fare is based on the ...

24

Managing Construction Risks of the Toll Road Project in Indonesia

Managing Construction Risks of the Toll Road Project in Indonesia

... the toll road development projects in Indonesia (1973-2015), the land acquisition process has been undoubtedly classified as a complicated process and required a lot of efforts to be ...this toll ...

9

Enhancing a Better Operation Management of Indonesian Toll Road

Enhancing a Better Operation Management of Indonesian Toll Road

... develop toll road network extensively, the operation of existing toll road need to be improved to ensure a safety, smooth and efficient of toll traffic ...to toll operation and ...

8

Risk management in toll road project under public private partnership scheme (case study: Jakarta Outer Ring Toad (JORR) W1)

Risk management in toll road project under public private partnership scheme (case study: Jakarta Outer Ring Toad (JORR) W1)

... 4 Just like other infrastructure project, JORR W1 toll road project encounter constraints that affected the project performance and considered as the risk of the project. Zayed and Chang (2002) found that ...

19

Project Financing Models for Toll Road Investments: A State of the Art Literature Review

Project Financing Models for Toll Road Investments: A State of the Art Literature Review

... greenfield toll-road projects, financial sustainability has been a major ...Many toll roads cannot be operated. Although most of Indonesia’s 24 toll road concessions have already been ...

13

Impact of Toll Road Construction to Travel Time, Travel Costs and Job Accessibility Changes in Jakarta   Bandung Region

Impact of Toll Road Construction to Travel Time, Travel Costs and Job Accessibility Changes in Jakarta Bandung Region

... the road network, thus there is a growth in the total number of trips in the Jakarta – Bandung ...three toll roads that connect Jakarta and ...Jakarta-Cikampek toll road and is built in ...

71

Risk in Government’s Estimate for Toll Road: Based on Investors’ Perspective

Risk in Government’s Estimate for Toll Road: Based on Investors’ Perspective

... for toll road concession award, as a comparator for investors’ bids, has been criticized by investors, as it does not fully include the proper cost of ...

8

Compliance and non compliance of heavy 
		vehicles lane usage in toll road

Compliance and non compliance of heavy vehicles lane usage in toll road

... divided road without any road ...by toll road operators (Badan Pengatur Jalan Tol, 2016), the HV terminology in this research is used for two types of vehicle such as large bus and large ...to ...

11

The Effect of Land Use on the Road’s Level of Service In Lawang – Singosari Road Due to the Construction of Malang – Pandaan Toll Road

The Effect of Land Use on the Road’s Level of Service In Lawang – Singosari Road Due to the Construction of Malang – Pandaan Toll Road

... Pandaan toll road development is expected to be able to decrease the congestion on the artery ...branching road is traffic flow and traffic diversion curve ...Pandaan toll road affects ...

8

Developing Road Infrastructure Route Planning: Increasing Feasibility of Toll Road Project

Developing Road Infrastructure Route Planning: Increasing Feasibility of Toll Road Project

... Sumatera Toll Road in West Sumatera province will pass through several cities and ...Sumatera Toll Road are Payakumbuh City and Bukittinggi ...

6

DfT 2006-2008 M6 Toll Road Study: Report on the M6 Toll Road Study Freight SP surveys.

DfT 2006-2008 M6 Toll Road Study: Report on the M6 Toll Road Study Freight SP surveys.

... This report has documented on the freight SP work of the 2006-8 UK Department for Transport M6 Toll road project. Freight SP surveys quite normally have to manage with small sample sizes, and the ...

66

Productivity of Bored Pile Foundation In Jakarta Inner City Toll Road (A Case Study)

Productivity of Bored Pile Foundation In Jakarta Inner City Toll Road (A Case Study)

... City Toll Roads, has become a National Strategic Project ...the toll road section of ...this toll road adopts the construction of elevated structure (flyover), with Bus Rapid Transit ...

8

The more the merrier? Number of bidders, information dispersion, renegotiation and winner’s curse in toll road concessions

The more the merrier? Number of bidders, information dispersion, renegotiation and winner’s curse in toll road concessions

... of toll road concession contracts – absence of a regulator in most countries, all price-cap contracts, and consortiums composed most of time of both local and foreign companies – we introduced three ...

40

Effect of Work Safety and Health Knowledge on Construction Workers in Cawang Tomang Cengkareng Toll Road Projects

Effect of Work Safety and Health Knowledge on Construction Workers in Cawang Tomang Cengkareng Toll Road Projects

... of road works is an important part that is often overlooked in the construction and maintenance of ...the road work location is the responsibility of the road ...the Toll Road ...

6

Funding Strategy Bali-Mandara Toll Road Rest Area Investment Plan

Funding Strategy Bali-Mandara Toll Road Rest Area Investment Plan

... Therefore, the party from PT. JASAMARGA BALI TOL (JBT) took some actions to cover the deficit. One effort that can be done is to build a rest area that has the potential to increase the number of toll road ...

8

Autonomous Tracking of Vehicle Taillights for Avoiding Accidents in Toll Road

Autonomous Tracking of Vehicle Taillights for Avoiding Accidents in Toll Road

... Coding accessible in MATLAB based on morphological algorithm able of vehicle detecting and tracking taillights, detecting alert signals (turns and brakes) in existing system. The resulting output provided daytime and ...

8

Robust Toll Pricing

Robust Toll Pricing

... M6 toll between Cannock and Coleshill, which opened in ...M6 toll made a 1 million pound loss in the year 2012”,“drivers have said the road is underused because of its ...“right” toll price ...

39

Modeling truck toll competition between two cross-border bridges under various regimes

Modeling truck toll competition between two cross-border bridges under various regimes

... of toll road ...each road remains unchanged and is only determined by the road’s own unit construction ...the toll and capacity levels of a new road added onto an existing network with ...

96

Value engineering in road construction at expansive soil problem

Value engineering in road construction at expansive soil problem

... Infrastructure projects, particularly toll road construction requires a large investment with a very long construction period. The number of factors and stakeholders involved, led to the risk of the project ...

37

Show all 7389 documents...

Related subjects