Minimizing the Number of Tardy Jobs on Single Machine Scheduling with Flexible Maintenance Time
... study, single machine scheduling with flexible maintenance is considered to minimize the weighted number of tardy ...starting time of maintenance is the ... See full document
17
A new mathematical model for single machine batch scheduling problem for minimizing maximum lateness with deteriorating jobs Pages 253-264 Download PDF
... deterioration scheduling problem in which the processing time of a job was a function of its starting ...for single machine scheduling problem considered this problem to minimize the ... See full document
12
Fuzzy Programming Approach for a Multi-objective Single Machine Scheduling Problem with Stochastic Processing Time
... a single machine scheduling problem minimizing the total weighted flow time and total weighted ...a single machine scheduling ...bi-criteria single ... See full document
5
A two-agent scheduling problem in a two-machine flowshop Pages 289-306 Download PDF
... Polynomial Time Approximation Scheme (FPTAS) for the scheduling problem in a single-machine environment with the objective of minimizing the total weighted completion times of the first ... See full document
18
Multi-criteria sequence-dependent single machine scheduling using genetic and simulated annealing algorithms
... job scheduling on this single machine by trying to minimize downtime while respecting the different deadlines ...in single machine scheduling are very ...of jobs run on a ... See full document
6
Hierarchical Minimization of Total Completion Time and Number of Tardy Jobs Criteria
... the single criterion problems of minimizing the number of tardy jobs with release dates on a single machine (which is now the more important criterion in the bicriteria ... See full document
5
Two Stage Flow Shop Scheduling Model Including Transportation Time with Equipotential Machines at Every Stage
... parallel machine scheduling includes scheduling of n jobs over m identical parallel machines ...dispensation time with the objective of optimizing different criterion ...parallel ... See full document
5
Online Full Text
... job scheduling problems. They constructed models where the processing time of a job is a function of its starting ...of minimizing the makespan, total flow time, sum of weighted completion ... See full document
6
Minimizing Makespan with Start Time Dependent Jobs in a Two Machine Flow Shop
... the scheduling problem on a single machine with linear deteriorating jobs to minimize the number of tardy jobs is NP-hard; hence, a B&B procedure and a heuristic as an ... See full document
10
Combined objective optimization in Identical Parallel Machine Scheduling problem using PSO
... parallel machine scheduling problem for minimizing make span and minimizing number of tardy jobs simultaneously are proved to be NP-Hard problems ...production ... See full document
5
Single Machine Slack Due Window Assignment and Scheduling of Linear Time Dependent Deteriorating Jobs and a Deteriorating Maintenance Activity
... classical scheduling theory, job processing times are considered as ...solving scheduling problems with changeable job processing times has been witnessed in the last ...of minimizing makespan on m ... See full document
9
Single Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs
... the scheduling problems with precedence and resource ...for minimizing the mean tardiness, when jobs with n-number of precedence constraints are assigned on m-number of parallel ...for ... See full document
7
Minimizing idle time of critical machine in permutation flow environment with weighted scheduling
... critical machine consideration were included in this ...of minimizing makespan as well as minimizing critical machine ideal ...ideal time reduction in critical machine helps to ... See full document
11
Multicore workload scheduling in JUNO[1]
... the number of cores is one of the important factors for matching resources and ...mark number of cores, which jobs, sites and pilots are configured ...the number of cores the jobs ... See full document
8
Integer batch scheduling problems for a single-machine with simultaneous effect of learning and forgetting to minimize total actual flow time Pages 365-378 Download PDF
... flow time criteria can be used in batch scheduling problems to minimize setup cost and inventory cost, ...Flow time in Dobson et ...the scheduling period (time zero), and all parts in ... See full document
14
A New Fuzzy Hybrid Dynamic Programming for Scheduling Weighted Jobs on Single Machine
... On analyzing Table 11, it could be figured out that increasing in initial population could most of times make last results better; however, it costs much computational time. In addition, there is a case not only ... See full document
19
Solving Single Machine Scheduling Problem Using Type-2 Trapezoidal Fuzzy Numbers
... a single machine scheduling problem minimizing the maximum lateness of jobs with fuzzy precedence ...a single machine scheduling problem with fuzzy due ...a ... See full document
9
Hybrid Algorithm for Optimization Problems Applied to Single Machine Scheduling
... less time than naive methods and it obtains exact solution but it stay costly in time (exponential time complexity), for this, it’s discouraged for biggest size ... See full document
5
Clustering of aircraft maintenance jobs at AIS airlines
... or minimizing the total costs. However, as the number of maintenance activities increases, the computational time for the dynamic programming technique also ...and maintenance ... See full document
58
An investigation of the dispatching and expediting rules in buffer management : a thesis presented in partial fulfilment of the requirements for the degree of Master of Technology in Production Technology at Massey University
... At the higher levels of MPC, the static and dynamic expediting rules produce the same performance in delay time, cycle time and percent jobs tardy, but less expediting is required with t[r] ... See full document
136