Total Weighted Flow Time
A New ILP Model for Identical Parallel-Machine Scheduling with Family Setup Times Minimizing the Total Weighted Flow Time by a Genetic Algorithm
12
Fuzzy Programming Approach for a Multi-objective Single Machine Scheduling Problem with Stochastic Processing Time
5
Electromagnetism-like algorithm for fuzzy flow shop batch processing machines scheduling to minimize total weighted earliness and tardiness
12
A branch and bound algorithm to minimize the total weighted number of tardy jobs and delivery costs with late deliveries for a supply chain scheduling problem
11
Single-machine batch scheduling minimizing weighted flow times and delivery costs with job release times Pages 347-364 Download PDF
18
Contagious capital : a network analysis of interconnected intermediaries
52
GRASP to minimize total weighted tardiness in a permutation flow shop environment Pages 161-176 Download PDF
16
Minimizing idle time of critical machine in permutation flow environment with weighted scheduling
11
MINIMIZE THE BATCH DELIVERY IN MACHINE SCHEDULING
6
Heuristic Based Approach for BI-Criteria Optimization of Minimizing Makespan and Total Flow Time of Flowshop Scheduling
11
Online Full Text
6
Preliminary. Dual-line FLOW rate/totalizers. Pr ovu Model PD6200 Analog Input. Pr ovu Model PD6300 Pulse Input. Analog Inputs.
8
Pressure behavior of horizontal wells in dual porosity, dual permeability naturally fractured reservoirs
13
A Hybrid Algorithm for Multi-Objective Optimization of Minimizing Makespan and Total Flow Time in Permutation Flow Shop Scheduling Problems
11
Heuristic for Three Machines in Tandem with Setup and Transportation Times of Jobs
7
Oxygen transfer during aerobic exercise in a varanid lizard Varanus mertensi is limited by the circulation
12
The element wise weighted total least squares problem
29
A Heuristic’s Job Order Gain in Pyramidal Preemptive Job Scheduling Problems for Total Weighted Completion Time Minimization
8
An investigation into minimising total energy consumption and total weighted tardiness in job shops
10
Nitrogen and phosphorus losses from a feedlot for suckler cows
15