[PDF] Top 20 Two machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times

Has 10000 "Two machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times" found on our website. Below are the top 20 most common "Two machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times".

Two machine flowshop scheduling problem to minimize makespan or
total completion time with random and bounded setup times

Two machine flowshop scheduling problem to minimize makespan or total completion time with random and bounded setup times

... considering setup times as ...the two-machine separate setup time prob- lem with respect to ...the setup times are considered as separate from processing ... See full document

12

No Wait Flowshops to Minimize Total  Tardiness with Setup Times

No Wait Flowshops to Minimize Total Tardiness with Setup Times

... no-wait flowshop scheduling problem is addressed where setup times are treated as separate from processing ...to minimize total ...superior. Two heuristics, a ... See full document

8

Heuristic for Three Machines in Tandem with Setup and Transportation Times of Jobs

Heuristic for Three Machines in Tandem with Setup and Transportation Times of Jobs

... of two production stages while studying a queuing system concerned with an industry in which the production of an item takes place in two distinct but successive ...the problem of scheduling ... See full document

7

A heuristic algorithm for scheduling in a flow shop environment to minimize makespan   Pages 173-184
		 Download PDF

A heuristic algorithm for scheduling in a flow shop environment to minimize makespan Pages 173-184 Download PDF

... minimizing makespan, where set-up, processing and removal times are ...shop scheduling problem including setup times with objective function of weighted sum of makespan ... See full document

12

Multi-objective sequence dependent setup times hybrid flowshop scheduling: A literature review

Multi-objective sequence dependent setup times hybrid flowshop scheduling: A literature review

... a two-level multi-start simulated annealing (TLMSA) heuristic with the objectives of simultaneously minimizing the makespan and the total flow time (or total ...to minimize the ... See full document

53

Minimizing Makespan with Start Time Dependent Jobs in a Two Machine Flow Shop

Minimizing Makespan with Start Time Dependent Jobs in a Two Machine Flow Shop

... the scheduling problem on a single machine with linear deteriorating jobs to minimize the number of tardy jobs is NP-hard; hence, a B&B procedure and a heuristic as an upper bound was ... See full document

10

Heuristic Based Approach for BI-Criteria Optimization of Minimizing Makespan and Total Flow Time of Flowshop Scheduling

Heuristic Based Approach for BI-Criteria Optimization of Minimizing Makespan and Total Flow Time of Flowshop Scheduling

... traditional flowshop problems but they do not demonstrate repeatability or provide an explanation of a solution is ...relevant scheduling rules directly from an ...of flowshop scheduling ... See full document

11

M-machine, no-wait flowshop scheduling with sequence dependent setup times and truncated learning function to minimize the makespan   Pages 309-322
		 Download PDF

M-machine, no-wait flowshop scheduling with sequence dependent setup times and truncated learning function to minimize the makespan Pages 309-322 Download PDF

... in scheduling was introduced by Biskup (1999) and Cheng and Wang ...elementary scheduling systems with learning effect it is assumed that learning effects are used for job processing ...processing ... See full document

14

Lot Streaming in No-wait Multi Product Flowshop Considering Sequence Dependent Setup Times and Position Based Learning Factors

Lot Streaming in No-wait Multi Product Flowshop Considering Sequence Dependent Setup Times and Position Based Learning Factors

... no-wait flowshop scheduling problem with more than two machines is strongly ...polynomial time algorithms for two-machine no-wait flow shop scheduling ...no-wait ... See full document

9

A two-agent scheduling problem in a two-machine flowshop   Pages 289-306
		 Download PDF

A two-agent scheduling problem in a two-machine flowshop Pages 289-306 Download PDF

... the two machine flowshop are related to the problem considered in this paper, some relevant studies are reviewed in the ...minimizing makespan in a two-machine ... See full document

18

Multi-criteria sequence-dependent single machine scheduling using genetic and simulated annealing algorithms

Multi-criteria sequence-dependent single machine scheduling using genetic and simulated annealing algorithms

... single machine scheduling problem with setup ...the time-dependent TSP. Because this problem is NP-hard, many researchers used a wide variety of metaheuristics to solve this ... See full document

6

Efficient Heuristic to Minimize Makespan in Single Machine Scheduling Problem with Unrelated Parallel Machines

Efficient Heuristic to Minimize Makespan in Single Machine Scheduling Problem with Unrelated Parallel Machines

... to minimize the makespan. Since, this problem is NP-hard, any attempt to obtain the optimal solution through exact algorithm may end with failure for most of the ...tional time to solve such ... See full document

11

Flow-shop scheduling problem under uncertainties: Review and trends   Pages 399-426
		 Download PDF

Flow-shop scheduling problem under uncertainties: Review and trends Pages 399-426 Download PDF

... job scheduling is one of the most important at the operational decision-making level to enable organizations to achieve ...competiveness. Scheduling consists in the allocation of limited resources to ... See full document

28

Online Full Text

Online Full Text

... open-shop scheduling; this technique consisted of a hybridized solution construction mechanism for ant colony optimization (ACO) with a beam ...open-shop problem [6]. A heuristic technique for the open-shop ... See full document

5

Investigation of the two-machine flow shop scheduling problem to minimize total energy costs with time-dependent energy prices

Investigation of the two-machine flow shop scheduling problem to minimize total energy costs with time-dependent energy prices

... related scheduling research and in the second part, scheduling research with concentration on time-dependent-costs, ...the problem TFTT is introduced and a small example is ...the ... See full document

16

Single machine batch processing problem with release dates to minimize total completion time   Pages 331-348
		 Download PDF

Single machine batch processing problem with release dates to minimize total completion time Pages 331-348 Download PDF

... (BP) problem has been attracting many academics and practitioners because of its intensive applications in the real-world ...similar problem wherein jobs must be grouped into batches and contemporarily ... See full document

18

Online Full Text

Online Full Text

... processing times are fixed and known from the first job to be processed to the last job to be ...perform setup, to deal with machine operations and software, or to handle raw materials and components ... See full document

6

Reduce the Time Of Multi Job Operation by Flow Shop and Gantt Chart

Reduce the Time Of Multi Job Operation by Flow Shop and Gantt Chart

... By Scheduling, we assign a particular time for completing a particular ...of scheduling is to arrive at a position where we will get minimum processing ...The problem examined here is the ... See full document

11

β   Robust Parallel Machine Scheduling with Uncertain Durations

β Robust Parallel Machine Scheduling with Uncertain Durations

... real-world scheduling problems, and scheduling solutions should be robust against ...processing time of each task follows a normal distribution and total completion times as main ... See full document

6

GA Based Heuristic to Minimize Makespan in Single Machine Scheduling Problem with Uniform Parallel Machines

GA Based Heuristic to Minimize Makespan in Single Machine Scheduling Problem with Uniform Parallel Machines

... to minimize the makespan in the single machine scheduling problem with uniform parallel ...given problem and select the best ... See full document

11

Show all 10000 documents...