• No results found

Flow Shop Sequencing Problem

Migrating Birds Optimization for Flow Shop Sequencing Problem

Migrating Birds Optimization for Flow Shop Sequencing Problem

... Flow shop sequencing problem (FSSP) is a production planning ...planning problem in to- day’s manufacturing systems planning process has a very important ...

6

A Novel Hybrid Algorithm for Permutation Flow          Shop Scheduling

A Novel Hybrid Algorithm for Permutation Flow Shop Scheduling

... permutation flow shop sequencing problem with the objective of makespan minimization using the new modified proposed method of johnson’s algorithm as well as the gupta’s heuristic ...the ...

5

AN INTERVAL VALUED INTUITIONISTIC FUZZY WEIGHTED ENTROPY METHOD FOR FINDING OPTIMAL SEQUENCE OF FLOW SHOP SEQUENCING PROBLEMS

AN INTERVAL VALUED INTUITIONISTIC FUZZY WEIGHTED ENTROPY METHOD FOR FINDING OPTIMAL SEQUENCE OF FLOW SHOP SEQUENCING PROBLEMS

... the flow shop sequencing problem and the processing time with on interval valued intuitionistic fuzzy weighted ...the flow shop sequencing problem with interval ...

8

Vol 8, No 9 (2017)

Vol 8, No 9 (2017)

... job sequencing algorithm which is modified to accept fuzzy processing times is used with octagonal fuzzy ...mean flow time were calculated using fuzzy arithmetic and we could find optimal or near-optimal ...

6

FLOW SHOP SCHEDULING PROBLEM WITH LOADING AND UNLOADING TIME

FLOW SHOP SCHEDULING PROBLEM WITH LOADING AND UNLOADING TIME

... Step V: Applying steps I, II, III, IV the problem has been solved for getting the optimal sequence. The scheduling of all the course of action is in such a way that the minimum time should be required for getting ...

12

Branch and Bound Technique in Flow Shop Scheduling Using Fuzzy Processing Times

Branch and Bound Technique in Flow Shop Scheduling Using Fuzzy Processing Times

... scheduling problem has attracted researchers from various fields. Permutation flow shop sequencing problems (PFSPs) have long been a topic of interest for the researchers & Practitioners ...

6

Download
			
			
				Download PDF

Download Download PDF

... to flow shop scheduling ...for flow shop scheduling can only be used to find the sequence of the jobs which optimizes the objective of interest but does not provide the value of the ...the ...

6

Minimization of Utilization Time for Specially Structured n × 3 Scheduling Model with Jobs in a String of Disjoint Job Blocks

Minimization of Utilization Time for Specially Structured n × 3 Scheduling Model with Jobs in a String of Disjoint Job Blocks

... m-machine problem and solved them using Johnson’s ...structured flow shop scheduling was studied by Gupta, ...stage flow shop model was explained by Gupta, ...studied flow ...

5

Best First Heuristic Pruning Function for General Flow Shop Scheduling Problem

Best First Heuristic Pruning Function for General Flow Shop Scheduling Problem

... scheduling problem is to reduce the completion time of all jobs on all machines, at that time it is expected to think of ways of scheduling or sequencing the jobs to reduce the ...

11

1.
													Hybridization of soft computing techniques for flow shop scheduling problem

1. Hybridization of soft computing techniques for flow shop scheduling problem

... a sequencing problem with no machine substitute for each operation while in FJSSP, alternative machines are considered for each ...the problem are modified by applying some operators in the solution ...

7

Flow-shop scheduling problem under uncertainties: Review and trends   Pages 399-426
		 Download PDF

Flow-shop scheduling problem under uncertainties: Review and trends Pages 399-426 Download PDF

... objectives. Flow-shop (FS) scheduling problems encompass the sequencing processes in environments in which the activities or operations are performed in a serial ...and sequencing activities ...

28

Heuristics for no-wait flow shop scheduling problem   Pages 671-680
		 Download PDF

Heuristics for no-wait flow shop scheduling problem Pages 671-680 Download PDF

... No-wait flow shop scheduling refers to continuous flow of jobs through different ...The problem of no-wait with the objective of minimizing makespan in flow shop scheduling is ...

10

A Proposed Method for Permutation Flow Shop Scheduling

A Proposed Method for Permutation Flow Shop Scheduling

... permutation flow shop scheduling problem is ...scheduling problem is modified and extended to provide a solution for permutation flow of scheduling ...

5

An Iterative Random PSO to minimize Total-flowtime
          in Flowshop Scheduling

An Iterative Random PSO to minimize Total-flowtime in Flowshop Scheduling

... considering problem sizes with number of jobs (n) = 20, 50 and 100 and number of machines (m) = 10 and ...independent problem instances were considered for each problem ...

5

A polynomial-time algorithm for a flow-shop batching problem with equal-length operations

A polynomial-time algorithm for a flow-shop batching problem with equal-length operations

... the flow-shop batching problem with equal processing times and equal setup times, which is formulated as an integer non-linear programming problem of one variable k with a solution region ...

35

An Adjusted Intelligent Water Drop (AIWD) Algorithm in Flow Shop Scheduling Problem

An Adjusted Intelligent Water Drop (AIWD) Algorithm in Flow Shop Scheduling Problem

... job that has not been in ( ) list. First operation (the operation in machine 1) of each job can be performed any time. This means that these nodes can be visited by providing they are not in the list of ( ). While the ...

7

Multi-objective Differential Evolution for the Flow shop Scheduling Problem with a Modified Learning Effect

Multi-objective Differential Evolution for the Flow shop Scheduling Problem with a Modified Learning Effect

... permutation flow shop scheduling problem (PFSSP) with the modified Dejong's learning ...the problem is encoded with an appropriate rule to make the continuous nature of DE suitable for ...

10

Fuzzy Simulation based Genetic Algorithm for Just in Time Flow Shop Scheduling with Linear Deterioration Function

Fuzzy Simulation based Genetic Algorithm for Just in Time Flow Shop Scheduling with Linear Deterioration Function

... no-wait flow shop scheduling problem with job ...this problem, polynomial-time algorithms exist to minimize the ...a flow shop scheduling problem with deteriorating jobs ...

8

RANDOM LINEAR NETWORK CODING BASED MULTIPATH TRAFFICS OVER HETEROGENEOUS CLOUD 
RADIO ACCESS NETWORK

RANDOM LINEAR NETWORK CODING BASED MULTIPATH TRAFFICS OVER HETEROGENEOUS CLOUD RADIO ACCESS NETWORK

... Salesman Problem (ATSP), and developed two metaheuristics which comprises of three ...large problem instances and simulation results demonstrated that the proposed metaheuristic outperform over all existing ...

12

Analyzing a few Heuristic Algorithms Considering Machine Idle Time and Processing Time in Permutation Flow Shop Scheduling Problems

Analyzing a few Heuristic Algorithms Considering Machine Idle Time and Processing Time in Permutation Flow Shop Scheduling Problems

... In the algorithm using the ratio of machine idle time to total processing time (IT/PT), in ascending order (serial number 8 above), the ratio array is [1.8438 2.1290 1.9091 2.0000 1.6176]. The ratio array is sorted in ...

9

Show all 10000 documents...

Related subjects