• No results found

underground high voltage cable

Tangent Delta Low Voltage High Frequency 
		AC method to measure HV 
		underground xlpe cables

Tangent Delta Low Voltage High Frequency AC method to measure HV underground xlpe cables

... 132kV cable. There are four types of 132kV 400mm 2 Cu XLPE cable samples were prepared by cable manufacturer which consisted of good cable, induced defect cables having void (low severity), ...

6

Hybrid GSA-ANN Methods to Forecast Sheath Current of High Voltage Underground Cable Lines

Hybrid GSA-ANN Methods to Forecast Sheath Current of High Voltage Underground Cable Lines

... of high voltage underground cable line is determined before this line is installed, so the most suitable bonding method can be selected to prevent cable faults and electroshock ...

9

IOT based underground cable fault detector

IOT based underground cable fault detector

... low voltage and medium voltage distribution lines, underground cables have been used for many ...decades. Underground high voltage cables are used more and more because they are ...

5

UNDERGROUND CABLE FAULT DETECTION USING IOT

UNDERGROUND CABLE FAULT DETECTION USING IOT

... The MAX232 is an integrated circuit first created in 1987 by Maxim Integrated Products that converts signals from a TIA-232(RS-232) serial port to signals suitable for use in TTL-compatible digital logic circuits. The ...

10

Detection of Underground Cable Fault using Arduino

Detection of Underground Cable Fault using Arduino

... abnormal high currents through the equipment or transmission ...in voltage[6].This change in voltage may cause serious damages to the system if not corrected in ...

5

Detection, Classification and Location of Faults in Underground Cable by Wavelet Technique

Detection, Classification and Location of Faults in Underground Cable by Wavelet Technique

... ABSTRACT: Electric power systems have rapidly grown for the past fifty years. Speedy and precise fault location plays an important role in accelerating system restoration, reducing outage time, reducing great financial ...

12

GSM based Underground Cable Fault Detection

GSM based Underground Cable Fault Detection

... local voltage and current as input ...for cable capacitive current compensation in the fault location formulation is proposed by using systempsilas data, as lines impedance and admittance matrices, and also ...

5

Electric Field Analysis of High Voltage Underground Cable using Finite Element Method

Electric Field Analysis of High Voltage Underground Cable using Finite Element Method

... Acquired equation is a big dimensional matrix with many zeros. By solving this linear equation system with an iterative numerical solution method, node potential of triangle elements are obtained. Depending upon ...

6

APPLICATION OF DIFFERENT ANN METHODS TO PROVIDE ELECTRICAL SAFETY IN HIGH VOLTAGE UNDERGROUND CABLE LINES

APPLICATION OF DIFFERENT ANN METHODS TO PROVIDE ELECTRICAL SAFETY IN HIGH VOLTAGE UNDERGROUND CABLE LINES

... of high voltage underground cable line which will be installed as a new line can be determined at project phase before installation of this line, the required precautions and the most suitable ...

9

Lightning effects on underground distribution cable using alternative transient program

Lightning effects on underground distribution cable using alternative transient program

... the voltage raised higher than it’s rated. A transient overvoltage is a high voltage which has a rapid rise to the peak value and slowly decays to zero value ...excess voltage where resistance ...

38

Identification of Fault Types for Underground Cable using Discrete Wavelet Transform

Identification of Fault Types for Underground Cable using Discrete Wavelet Transform

... Results illustrated from Tables 1 to 2 are obtained from one case of phase A to ground fault. Case studies are varied so that the decision algorithm capability can be verified. Various case studies are performed with ...

5

Solar Powered Underground Cable Fault Distance   Locator Over IOT

Solar Powered Underground Cable Fault Distance Locator Over IOT

... dc voltage is applied at the feeder end through a series resistor (cable lines), then the current would vary depending upon the location of the fault in the cable as the resistance is proportional to ...

7

Influence The Effect Of Cavity Size And Position In High Voltage Cable By Using Finite Element Method

Influence The Effect Of Cavity Size And Position In High Voltage Cable By Using Finite Element Method

... HV cable is investigated by evaluating electrical resistance in the conductor ...the cable is subjected to severe mechanical ...the cable is unavoidable ...

5

UNDERGROUND CABLE FAULT DISTANCE DETECTOR USING ATMEGA328 MICROCONTROLLER

UNDERGROUND CABLE FAULT DISTANCE DETECTOR USING ATMEGA328 MICROCONTROLLER

... 5. M.-S. Choi, D.-S. Lee, and X. Yang, “A line to ground fault location algorithm for underground cable system,” KIEE Trans Power Eng., 7148 ISSN: 2347-1697 International Journal of Informative & ...

8

Collation Studies of Sequence Impedances for Underground Cables with Different Layouts

Collation Studies of Sequence Impedances for Underground Cables with Different Layouts

... insulated cable systems mainly in EHV and HV ...core underground cable with different layouts for Copper and Aluminium Core ...Keywords–Underground Cable, Phase Impedance Matrix, ...

6

Underground Cable Fault Distance Detector using ATmega328 Microcontroller

Underground Cable Fault Distance Detector using ATmega328 Microcontroller

... the cable, causing no insulation degradation. A theoretically perfect cable returns that signal in a known time and in a known ..."real-world" cable alter both the time and profile, which the ...

9

Fault Location and Incipient Fault Detection in Distribution Cables

Fault Location and Incipient Fault Detection in Distribution Cables

... in underground cables can be normally classified as two categories: incipient faults and permanent ...defective cable, even trip the suspected feeder to limit the repetitive voltage ...

266

 EFFICIENT SCHEDULING OF WORKFLOW IN CLOUD ENVIORNMENT USING BILLING MODEL AWARE 
TASK CLUSTERING

 EFFICIENT SCHEDULING OF WORKFLOW IN CLOUD ENVIORNMENT USING BILLING MODEL AWARE TASK CLUSTERING

... In cable trench construction, one of the tasks for engineers is to select a suitable route to minimize construction cost and ...of underground power supply cable between any two ...

5

Development of suitable method in connecting wires for Resistive Plate Chambers

Development of suitable method in connecting wires for Resistive Plate Chambers

... For understanding this method one should focus on the Figure 3 in which we have shown it in a pictorial way for better understanding. In this method we considered Aluminium foil of two different thicknesses such as 0.175 ...

8

ELECTRIC FIELD AND CURRENT DENSITY CHARACTERISTIC OF CONTAMINATED SOLID INSULATOR

ELECTRIC FIELD AND CURRENT DENSITY CHARACTERISTIC OF CONTAMINATED SOLID INSULATOR

... medium voltage XLPE insulated cable displays the concentration of current density and electric field at each layer of the ...indicates high electric field and current ...insulated cable ...

7

Show all 10000 documents...

Related subjects