• No results found

[PDF] Top 20 A Modified Iterated Greedy Algorithm for Flexible Job Shop Scheduling Problem

Has 10000 "A Modified Iterated Greedy Algorithm for Flexible Job Shop Scheduling Problem" found on our website. Below are the top 20 most common "A Modified Iterated Greedy Algorithm for Flexible Job Shop Scheduling Problem".

A Modified Iterated Greedy Algorithm for Flexible Job Shop Scheduling Problem

A Modified Iterated Greedy Algorithm for Flexible Job Shop Scheduling Problem

... between flexible job shop schedul- ing problem and job shop scheduling problem (JSP) is that flexible job shop problem dictates ... See full document

11

A chaotic simulated annealing and particle swarm improved artificial immune algorithm for flexible job shop scheduling problem

A chaotic simulated annealing and particle swarm improved artificial immune algorithm for flexible job shop scheduling problem

... FJSP problem solving algorithms [3]. The current FJSP problem solving algorithms can be roughly divided into three categories: exact solution algorithms, heuristic algorithms, and artificial intelligence ... See full document

10

Optimization of Thrust Force and Material Removal Rate in Turning EN-16 Steel Alloy using Taguchi Approach

Optimization of Thrust Force and Material Removal Rate in Turning EN-16 Steel Alloy using Taguchi Approach

... for flexible job shop ...genetic algorithm was used in order to solve the problem and it was tested on standard problems available in literature of different ...developed ... See full document

9

Solving Job Shop Scheduling Problem Using an Ant Colony Algorithm

Solving Job Shop Scheduling Problem Using an Ant Colony Algorithm

... unscheduled job to the partial sequence constructed so far until a complete solution is ...a job is chosen by applying a transition rule based on the pheromone ...are modified by applying a global ... See full document

8

Flexible Job-shop Scheduling Problem with Sequencing Flexibility: Mathematical Models and Solution Algorithms

Flexible Job-shop Scheduling Problem with Sequencing Flexibility: Mathematical Models and Solution Algorithms

... The algorithm to get a topological sort of a DAG starts by marking all the nodes as not visited, then a node 𝑣 𝑖𝑛 𝑁 is randomly ...sort algorithm and the function TopologicalSortUntil  ... See full document

218

A Comparison between Two Modified NSGA II Algorithms for Solving the Multi objective Flexible Job Shop Scheduling Problem

A Comparison between Two Modified NSGA II Algorithms for Solving the Multi objective Flexible Job Shop Scheduling Problem

... the job shop scheduling problem (JSSP), the jobs can be processed on more than one ...the problem as (i) the hierarchical approach with decomposition and (ii) the integrated appro- ... See full document

15

A Multiple objective Particle Swarm Optimization for Flexible Job Shop Scheduling Problem

A Multiple objective Particle Swarm Optimization for Flexible Job Shop Scheduling Problem

... genetic algorithm[3][4], particle swarm algorithm[5], ant colony algorithm[6] and so ...no algorithm that is optimal on all ...genetic algorithm with priority-based representation is ... See full document

6

An alternative hybrid evolutionary technique focused on allocating machines and sequencing operations   Pages 585-596
		 Download PDF

An alternative hybrid evolutionary technique focused on allocating machines and sequencing operations Pages 585-596 Download PDF

... hybrid algorithm for the Flexible Job-Shop Scheduling Problem ...This problem involves the optimal use of resources in a flexible production environment in which ... See full document

12

Study on multi-objective flexible job-shop scheduling problem considering energy consumption

Study on multi-objective flexible job-shop scheduling problem considering energy consumption

... NSGA-II algorithm is developed, which is named Blood-Variation-based NSGA-II(BVNSGA-II) and its crossover and mutation strategy is ...new algorithm can avoid early convergence to local optimal ... See full document

16

Overlap Algorithms in Flexible Job-shop Scheduling

Overlap Algorithms in Flexible Job-shop Scheduling

... Literature shows examples of hybrid GA with intelligent genetic operators than produce optimal schedules. This is the case of [4], that describe an effective hybridation of both techniques, applying improved crossover ... See full document

7

Multi objective Flexible Job Shop Scheduling Optimization Using BFOA

Multi objective Flexible Job Shop Scheduling Optimization Using BFOA

... The flexible job-shop scheduling (FJS) is a branch of production scheduling, which is NP-hard combinatorial optimization problem ...FJS problem (FJSP) is composed of two ... See full document

7

An economic lot and delivery scheduling problem with the fuzzy shelf life in a flexible job shop with unrelated parallel machines   Pages 663-680
		 Download PDF

An economic lot and delivery scheduling problem with the fuzzy shelf life in a flexible job shop with unrelated parallel machines Pages 663-680 Download PDF

... their problem in the ELSP and ELDSP (Yao et ...the problem with two basic methods, namely independent solution (IS) and common cycle ...the problem in a single machine based on the extended basic ... See full document

18

Bi objective Optimization Model for Integrated Preventive Maintenance and Flexible Job shop Scheduling Problem

Bi objective Optimization Model for Integrated Preventive Maintenance and Flexible Job shop Scheduling Problem

... standard flexible job-shop test problems from [3] and [4] are ...n-jobs flexible job-shop test problems are ...MOICA algorithm two comparison metrics are taken into ... See full document

8

SENTIMENT ANALYSIS USING REPRESENTATIVE TERMS  A GROUPING APPROACH FOR BINARY 
CLASSIFICATION OF DOCUMENTS

SENTIMENT ANALYSIS USING REPRESENTATIVE TERMS A GROUPING APPROACH FOR BINARY CLASSIFICATION OF DOCUMENTS

... the flexible job shop online scheduling ...a job can not be depicted as a Process-Tree, the approach is essential to scheduling algorithm, and which will involve the ... See full document

6

A Two-Individual Based Evolutionary Algorithm for the Flexible Job Shop Scheduling Problem

A Two-Individual Based Evolutionary Algorithm for the Flexible Job Shop Scheduling Problem

... We evaluate the performance of MAE on four bench- marks widely used in the literature: DPdata (Dauz`ere-P´er`es and Paulli 1997), BCdata (Barnes and Chambers 1998), BRdata (Brandimarte 1993), and HUdata (Hurink, Jurisch, ... See full document

10

Using a Modified Simulated Annealing Algorithm to Minimize Makespan in a Permutation Flow-shop Scheduling Problem with Job Deterioration

Using a Modified Simulated Annealing Algorithm to Minimize Makespan in a Permutation Flow-shop Scheduling Problem with Job Deterioration

... annealing algorithm has been widely used in classical scheduling problems; however, to the best of our knowledge, this algorithm is not applied to the problem of scheduling ... See full document

6

A Modified Giffler and Thompson Genetic Algorithm on the Job
Shop Scheduling Problem

A Modified Giffler and Thompson Genetic Algorithm on the Job Shop Scheduling Problem

... From table 6, the integer values for average makespan are 71, 68 and 69. Although we can get better result with high mutation rate, since mutation is the second way a GA explore a solution space, it is advisable to use ... See full document

17

Critical Path Method for Flexible Job Shop Scheduling Problem with Preemption

Critical Path Method for Flexible Job Shop Scheduling Problem with Preemption

... solve Flexible Job shop Scheduling Problem (FJSP) with assumed overlapping time of operations and by using memetic algorithm with two different ...the problem was analyzed ... See full document

9

Online Full Text

Online Full Text

... Abstract— Flexible Job Shop scheduling problem (FJSSP) is an important scheduling problem which has received considerable importance in the manufacturing ...genetic ... See full document

6

Designing a Multi-Objective Mathematical Model for Flexible Job Shop Scheduling Problem With the Earliness/Tardiness Penalty

Designing a Multi-Objective Mathematical Model for Flexible Job Shop Scheduling Problem With the Earliness/Tardiness Penalty

... SA algorithm is ...this problem in the coding scheme, which leads to the integration of the practical problem solution with production control systems, which often use the O-O approach ...the ... See full document

8

Show all 10000 documents...