dynamic single machine problem
Solving Single Machine Scheduling Problem Using Type-2 Trapezoidal Fuzzy Numbers
9
A Bi criterion Simulated Annealing Method for a Single Batch processing Machine Scheduling Problem with Dynamic Job Release Times
5
Dispatching Rule-based Scheduling Algorithms in a Single Machine with Sequence-dependent Setup Times and Energy Requirements
6
Hybrid Algorithm for Optimization Problems Applied to Single Machine Scheduling
5
Multi-criteria sequence-dependent single machine scheduling using genetic and simulated annealing algorithms
6
Triangle structure diagrams for a single machine batching problem with identical jobs
20
A Multi-Stage Single-Machine Replacement Strategy Using Stochastic Dynamic Programming
10
A new mathematical model for single machine batch scheduling problem for minimizing maximum lateness with deteriorating jobs Pages 253-264 Download PDF
12
Single Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs
7
Literature Review of Single Machine Scheduling Problem with Uniform Parallel Machines
18
A New Fuzzy Hybrid Dynamic Programming for Scheduling Weighted Jobs on Single Machine
19
Design Calculation and Performance Analysis of Single Suction Centrifugal Pump
6
Intrusion Detection System Using SVM Classification
5
Scheduling Precedence-Constrained Jobs On Two Resources To Minimize The Total Weighted Completion Time.
116
Deep Cutting Plane Inequalities for Stochastic Non Preemptive Single Machine Scheduling Problem
8
Biogeography-based Optimization (BBO) Algorithm for Single Machine Total Weighted Tardiness Problem (SMTWTP)
6
A Hybrid Differential Particle Swarm Optimization Approach to Solve a Multi-objective Parallel Machine Scheduling Problem
8
A Cluster-based Evolutionary Algorithm for the Single Machine Total Weighted Tardiness-scheduling Problem
7
A Single Machine Capacitated Production Planning Problem Under Uncertainty: A Grey Linear Programming Approach
6
HEURISTIC ALGORITHM FOR SINGLE RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM BASED ON THE DYNAMIC PROGRAMMING
18