Economic lot scheduling problem

Comparison of heuristics for an economic lot scheduling problem with deliberated coproduction

Comparison of heuristics for an economic lot scheduling problem with deliberated coproduction

... the Economic Lot Scheduling Problem Scheduling (ELSP) literature by making some modifications in order to introduce new constraints which had not been thoroughly studied with a view to ...

27

The Economic Lot Scheduling Problem: Exact Solutions and System Feasibility.

The Economic Lot Scheduling Problem: Exact Solutions and System Feasibility.

... The Economic Lot Scheduling Problem (ELSP) is a classical scheduling problem with the objective of minimizing the long-run inventory and setup costs of a single machine, ...

101

Multi product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing

Multi product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing

... the economic lot scheduling problem with separate lines for manufacturing and remanufac- turing, and focused on common-cycle-time policies, ...the problem for a fixed cycle time, which ...

13

Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups

Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups

... famous lot-sizing problems is the economic lot-scheduling problem ...with lot sizing and scheduling of several items in a single stage production facility, so that ...

16

The lot sizing problem: A tertiary study

The lot sizing problem: A tertiary study

... combined lot sizing and scheduling problems and differentiated works in this area with respect to the number of stages and the number of machines that are consid- ...the economic lot ...

26

Transitioning Schedules for the Economic Lot Sizing Problem

Transitioning Schedules for the Economic Lot Sizing Problem

... This problem, called the Economic Lot Scheduling Problem (ELSP), has been researched in many ...ELSP problem with setup costs, as well as inventory costs and setup ...the ...

14

An economic lot and delivery scheduling problem with the fuzzy shelf life in a flexible job shop with unrelated parallel machines   Pages 663-680
		 Download PDF

An economic lot and delivery scheduling problem with the fuzzy shelf life in a flexible job shop with unrelated parallel machines Pages 663-680 Download PDF

... an economic lot and delivery scheduling problem (ELDSP) in a fuzzy environment with the fuzzy shelf life for each ...This problem is formulated in a flexible job shop with unrelated ...

18

A Basic Period Approach for Solving the Economic Lot and Delivery Scheduling in Flexible Flow Lines

A Basic Period Approach for Solving the Economic Lot and Delivery Scheduling in Flexible Flow Lines

... • In Table 1, solution qualities of the proposed algorithm have been compared with the related optimal solution obtained via LINGO 6.0. As we can see, for the small size problem instances, the solutions of the PT- ...

14

A mathematical model for the product mixing and lot-sizing problem by considering stochastic demand   Pages 237-250
		 Download PDF

A mathematical model for the product mixing and lot-sizing problem by considering stochastic demand Pages 237-250 Download PDF

... and lot-sizing ...the economic value added generated by the ...and lot sizing problems by considering the expected economic contribution of products and variability of the ...the ...

14

Two parameter-tuned metaheuristic algorithms for the multi-level lot sizing and scheduling problem   Pages 751-766
		 Download PDF

Two parameter-tuned metaheuristic algorithms for the multi-level lot sizing and scheduling problem Pages 751-766 Download PDF

... in lot sizing and scheduling ...a problem, which scheduled productions of products on multiple identical ...simultaneous lot sizing and ...proportional lot sizing and scheduling ...

16

A new approach for solving capacitated lot sizing and scheduling problem with sequence and period-dependent setup costs

A new approach for solving capacitated lot sizing and scheduling problem with sequence and period-dependent setup costs

... the lot sizing problem without considering products sequencing and their ...of lot sizing problem and the start up and setup ...of lot sizing problem by assigning to the lowest ...

28

Vol 3, No 1 (2013)

Vol 3, No 1 (2013)

... In this paper, we discussed few contemporary load balancing strategies based on various approaches for computational grid environment. With the rapid development of technology, grid computing have increasingly becomes an ...

11

Train Scheduling Problem with Consideration of Praying Constraint as an Application of Job Shop Scheduling Problem

Train Scheduling Problem with Consideration of Praying Constraint as an Application of Job Shop Scheduling Problem

... The results are illustrating that the RPD avarage for SA, PSO, and EM algorithms equal 2.14%, 0.83%, and 0.65% respectively. The computed avearge RPD demonstrates that the EM relatively outperformes the SA, and PSO. ...

8

Lightning Search Algorithm (LSA) Technique for Solving Economic Dispatch (ED) Problem

Lightning Search Algorithm (LSA) Technique for Solving Economic Dispatch (ED) Problem

... problem has been solving by using Modified Social Spider Algorithm (MSSA).The conventional method that previously used are Genetic algorithm(GA),Particle swarm optimization (PSO) [6], Differential evolution (DE) ...

5

Resource Constrained Project Scheduling with Stochastic Resources

Resource Constrained Project Scheduling with Stochastic Resources

... The validity of the proposed mathematical model for RCPSP is given in previous Section. Nevertheless, the model covers only deterministic cases where parameters are all deterministic and constant. This assumption is not ...

11

A Machine Learning Approach on Providing Recommendations for the Vacant Lot Problem

A Machine Learning Approach on Providing Recommendations for the Vacant Lot Problem

... vacant lot model that can be used for building recommen- dations or predictions for future vacant lot conversions, and development and evaluation of such a prediction model on two example ...cant lot ...

48

Integrated capacitated lot sizing and scheduling problems in a flexible flow line

Integrated capacitated lot sizing and scheduling problems in a flexible flow line

... and Scheduling Problem in Flexible Flow Line (GLSP- FFL) optimizes the lot sizing and scheduling of multiple products at multiple stages, each stage having multiple machines in ...The ...

112

Throughput-Optimal Scheduling with Low Average Delay for Cellular Broadcast Systems

Throughput-Optimal Scheduling with Low Average Delay for Cellular Broadcast Systems

... maximization problem in Step 2 for which there exist already efficient algorithms (multiple input multiple output (MIMO) [16–18], orthogonal frequency division multiplex (OFDM) [19, ...

11

A decomposition algorithm for robust lot sizing problem with remanufacturing option

A decomposition algorithm for robust lot sizing problem with remanufacturing option

... ELSR problem is also motivated by these studies, where our objective is to generate optimal production plans when demands and returns are ...the lot sizing problem, wherein we consider uncertainty in ...

13

Quantitative Approaches on Staff Scheduling and  Rostering in Hospitality Management: An Overview

Quantitative Approaches on Staff Scheduling and Rostering in Hospitality Management: An Overview

... staff scheduling and ros- tering problem in hospitality management, or its sub- problems, may be inspired by the work that has been comprehensively done in both tour scheduling and nurse ...staff ...

9

Show all 10000 documents...