Earned Value Analysis
Cost Analysis of Road Construction Project by Earned Value Analysis using Primavera P6
6
Earned Value Analysis for Construction Projects Using Project Management Scheduling Engine
5
Earned Value Analysis of Construction Project at Rashtriya Sanskrit Sansthan, Bhopal
6
Performance Evaluation of Housing Construction Project, Using Earned Value Analysis; the Case of 20/80 Condominium Addis Ababa Bole Arabsa Site
7
Project Performance Evaluation through Earned Value Analysis
6
Project Performance Evaluation by Earned Value Analysis - A Case Study on multi-storeyed building at Bengaluru
10
Earned Value Analysis on an Ongoing Residential Building Project in Bangalore, India
12
Conditions of success for earned value analysis in projects
39
. THE COST CONTROLLING AND MONITORING OF CONSTRUCTION PROJECT THROUGH EARNED VALUE MANAGEMENT SYSTEM
6
Download Download PDF
11
Controlling and Monitoring the Construction Projects by using Earned Value Method
8
APPLICATION OF PROJECT MONITORING TOOLS FROM OWNERS PERSPECTIVE
10
Scheduling, Monitoring And Cost Analysis By Earned Value Method Of Phase-2 (Reach-2a From Pier No.443 To Pier No.470) Using Primavera P6
8
Predicting Earned Value Indexes in Residential complexes’ Construction Projects Using Artificial Neural Network Model
13
Value Management
11
THE APPLICATION OF EARNED VALUE MANAGEMENT (EVM) IN CONSTRUCTION PROJECT MANAGEMENT
11
Application of Earned Value Method and Delay Analysis on Construction Project to Analyse Cost and Schedule
6
Smart Construction Project Management
8
Measuring the actual energy cost performance of green buildings: a test of the earned value management approach
20
Re thinking the project manager's role and practice : a case study in the context of an IT department
334