lot-sizing problem
The lot sizing problem: A tertiary study
26
A hybrid heuristic for the multi-plant capacitated lot sizing problem with setup carry-over
9
A decomposition algorithm for robust lot sizing problem with remanufacturing option
13
Three Meta-heuristic Algorithms for the Single-item Capacitated Lot-sizing Problem (RESEARCH NOTE)
10
Joint Multi-item Storage Location Assignment Capacitated Lot Sizing Problem
191
Lot-Sizing Problem for a Multi-Item Multi-level Capacitated Batch Production System with Setup Carryover, Emission Control and Backlogging using a Dynamic Program and Decomposition Heuristic
167
A mathematical model for the product mixing and lot-sizing problem by considering stochastic demand Pages 237-250 Download PDF
14
Developing a New Reformulation of Single Level Capacitated Lot Sizing Problem (SLCLSP) with Set up, Shortage and Inventory Costs
11
MIP Formulations and Metaheuristics for Multi Item Capacitated Lot Sizing Problem with Non Customer Specific Production Time Windows and Setup Times
16
Computationally Efficient Problem Reformulations for Capacitated Lot Sizing Problem
11
Production Lot Sizing Problem with the Lead Time
11
A priori reformulations for joint rolling horizon scheduling of materials processing and lot sizing problem
33
Transitioning Schedules for the Economic Lot Sizing Problem
14
On the equivalence of strong formulations for capacitated multi-level lot sizing problems with setup times
26
Global Journal of Advanced Engineering Technologies and Sciences SUPPLIER SELECTION CRITERION IN UNCERTAIN PRODUCT COST: A DYNAMIC PROGRAMMING APPROACH Dhirendra Singh Parihar *1 , Manmohan Rahul 2
8
A Multi-objective Mathematical Model for Sustainable Supplier Selection and Order Lot-Sizing under Inflation
10
The capacitated Lot Sizing model: A powerful tool for logistics decision making
24
A relax-and-fix with fix-and-optimize heuristic applied to multi-level lot-sizing problems
33
A theoretical and computational analysis of lot-sizing in remanufacturing with separate setups
10
Lot Sizing in Production Scheduling at a Personal Protection Equipment Company
10