[PDF] Top 20 Two meta-heuristic algorithms for the dual-resource constrained flexible job-shop scheduling problem

Has 10000 "Two meta-heuristic algorithms for the dual-resource constrained flexible job-shop scheduling problem" found on our website. Below are the top 20 most common "Two meta-heuristic algorithms for the dual-resource constrained flexible job-shop scheduling problem".

Two meta-heuristic algorithms for the dual-resource constrained flexible job-shop scheduling problem

Two meta-heuristic algorithms for the dual-resource constrained flexible job-shop scheduling problem

... termed Dual-Resource Constrained (DRC) ...DRC scheduling has attracted much attention from ...the Dual- Resource Constrained Flexible Job-Shop ... See full document

16

A game theory model based on Gale Shapley for dual resource constrained (DRC) flexible job shop scheduling

A game theory model based on Gale Shapley for dual resource constrained (DRC) flexible job shop scheduling

... Most job shops in practice are constrained by both machine and labor ...so-called Dual Resource Constrained (DRC) job shops is typically solved in the literature via the use of ... See full document

13

Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)

Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)

... sizing problem has been solved using the well known dynamic programming, Wagner and Whitin, and Silver-Meal ...of problem is relatively large. Consequently, meta-heuristic algorithms ... See full document

7

A Comparison between Two Modified NSGA II Algorithms for Solving the Multi objective Flexible Job Shop Scheduling Problem

A Comparison between Two Modified NSGA II Algorithms for Solving the Multi objective Flexible Job Shop Scheduling Problem

... objectives. Two- objective and three-objective problems fall into a different class as the resulting Pareto-optimal ...optimization problem is not so clear, except for a few occasions, most practitioners ... See full document

15

Designing a Multi-Objective Mathematical Model for Flexible Job Shop Scheduling Problem With the Earliness/Tardiness Penalty

Designing a Multi-Objective Mathematical Model for Flexible Job Shop Scheduling Problem With the Earliness/Tardiness Penalty

... with two jobs, in which each operation had the same processing time in different ...the problem with the initial processes without consideration of alternative and flexibility has been investigated and the ... See full document

8

A Modified Iterated Greedy Algorithm for Flexible Job Shop Scheduling Problem

A Modified Iterated Greedy Algorithm for Flexible Job Shop Scheduling Problem

... Evolutionary algorithms, such as genetic algorithm (GA), are an effective type of meta-heuristic methods. Zhang et al. [11] proposed a bi-level GA in an attempt to keep the advantages of preceding ... See full document

11

Reference group genetic algorithm for flexible job shop scheduling problem with multiple objective functions

Reference group genetic algorithm for flexible job shop scheduling problem with multiple objective functions

... a scheduling algorithm for job shop scheduling problem with parallel machines and reentrant ...knowledge-based meta-heuristic algorithm, called knowledge-based variable ... See full document

17

A Multiple objective Particle Swarm Optimization for Flexible Job Shop Scheduling Problem

A Multiple objective Particle Swarm Optimization for Flexible Job Shop Scheduling Problem

... various algorithms has been the focus of optimization ...with two categories of nodes, then combine the ant system optimization meta-heuristic with local search methods to solve ... See full document

6

Overlap Algorithms in Flexible Job-shop Scheduling

Overlap Algorithms in Flexible Job-shop Scheduling

... the algorithms of a complex heuristic, like the overlap evaluator and repairers, in a hybrid GA applied to fJSP, a multi-objective ...of two variants for the repairer: one that does not take into ... See full document

7

Approach of Solving Dual Resource Constrained Multi-Objective Flexible Job Shop Scheduling Problem Based on MOEA/D

Approach of Solving Dual Resource Constrained Multi-Objective Flexible Job Shop Scheduling Problem Based on MOEA/D

... the two-layer coding of procedures and equipment commonly used in FJSP cannot be ...3*3*2 dual resource constrained flexible job shop scheduling problem ... See full document

15

1.
													Hybridization of soft computing techniques for flow shop scheduling problem

1. Hybridization of soft computing techniques for flow shop scheduling problem

... each job. JSSP is a sequencing problem with no machine substitute for each operation while in FJSSP, alternative machines are considered for each ...FJSSP, meta-heuristic approaches have been ... See full document

7

Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage

Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage

... jobshop scheduling problem is very useful as many practical production systems can be modeled as ...jobshop scheduling problem with lot streaming in the literature are not as extensive as the ... See full document

21

Heuristics For N Job M Machine Flowshop Batch Processing With Breakdown Times

Heuristics For N Job M Machine Flowshop Batch Processing With Breakdown Times

... of job completion times has ...machine scheduling models that impose constraints on both transportation capacity and transportation ...for two machine flow shop is given as F2(D),k=1|v=1,c|∑C ... See full document

11

Comparative Study of Different  Representations in Genetic Algorithms  for Job Shop Scheduling Problem

Comparative Study of Different Representations in Genetic Algorithms for Job Shop Scheduling Problem

... problems. Job scheduling prob- lems belong to this category and are termed NP-Hard ...of job shops is generally much larger than that of JSSP bench mark instances considered in theoretical ... See full document

10

A New model for integrated lot sizing and scheduling in flexible job shop problem

A New model for integrated lot sizing and scheduling in flexible job shop problem

... and scheduling problem in a flexible job shop environment with machine-capacity-constraint is ...and Scheduling Problems (PLSP), is proposed to formulate the ...the ... See full document

20

An Iterative Random PSO to minimize Total-flowtime
          in Flowshop Scheduling

An Iterative Random PSO to minimize Total-flowtime in Flowshop Scheduling

... Flowshop scheduling is an interdisciplinary challenge of addressing major optimality criteria of minimizing makespan and ...this problem towards ...when problem size is ... See full document

5

Agent Based Markov Chain For Job Shop Scheduling And Control: Review Of The Modeling  Technigue

Agent Based Markov Chain For Job Shop Scheduling And Control: Review Of The Modeling Technigue

... the job shop problem based on the decomposition of mathematical programming problems that used both Benders-type [10] and Dantzig/wolfe-type [11] ...real-time, two-level hierarchical ... See full document

16

A heuristic algorithm for scheduling in a flow shop environment to minimize makespan   Pages 173-184
		 Download PDF

A heuristic algorithm for scheduling in a flow shop environment to minimize makespan Pages 173-184 Download PDF

... flow shop consisting of n jobs and m ...a two-stage hybrid flow shop scheduling problem with setup and assembly ...using heuristic, genetic algorithm (GA), simulated annealing ... See full document

12

Job Shop Scheduling with Flexible Maintenance Planning

Job Shop Scheduling with Flexible Maintenance Planning

... The scheduling scenarios and solution methods introduced in previous sec- tions of this chapter often implicitly assume that machines and other equip- ment are 100% ...the job scheduling ...with ... See full document

304

An economic lot and delivery scheduling problem with the fuzzy shelf life in a flexible job shop with unrelated parallel machines   Pages 663-680
		 Download PDF

An economic lot and delivery scheduling problem with the fuzzy shelf life in a flexible job shop with unrelated parallel machines Pages 663-680 Download PDF

... delivery scheduling problem (ELDSP) in a fuzzy environment with the fuzzy shelf life for each ...This problem is formulated in a flexible job shop with unrelated parallel ... See full document

18