[PDF] Top 20 Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times
Has 10000 "Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times" found on our website. Below are the top 20 most common "Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times".
Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times
... of sequence-dependent setup times on the JSP ...examined scheduling rules by considering whether setup time or due date data is ...machines scheduling with ... See full document
17
Solving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization
... UPMs scheduling problem with sequence-dependent setup times, non- identical due dates, ready times and precedence relations to minimize the number of tardy jobs and the ... See full document
10
Multi-objective sequence dependent setup times hybrid flowshop scheduling: A literature review
... greedy minimizing the makespan and the total flow ...processing times and assignable due dates was evaluated in ...this problem, a SA approach was used h and a non-regular optimization ... See full document
53
Estimation of Heuristics for adaptation Flow Shops and Flow Shops with sequence Dependent Setup Times (SDST)
... of minimizing makespan and total flow time of ...of makespan given by Taillard ...flow shop scheduling ...of minimizing makespan and the total flowtime of jobs and applied ... See full document
7
M-machine, no-wait flowshop scheduling with sequence dependent setup times and truncated learning function to minimize the makespan Pages 309-322 Download PDF
... for scheduling problems, however, most researches have considered single or two-machine ...for job times instead of setup times and the same learning effect has been used for all ... See full document
14
A comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times
... Hybrid flow-shops (HFS) also known as flexible flow-shops (FFSP) or multi-processor flow-shops are common manufacturing environments in which a number of jobs are to be processed in a series of production stages, each of ... See full document
19
A Particle Swarm Optimization-based Algorithm for Flexible Assembly Job Shop Scheduling Problem with Sequence Dependent Setup Times
... above problem is usu- ally named the Integration of Process Planning and Scheduling (IPPS) ...IPPS problem is also known as the Flexible Job Shop Scheduling (FJSS) ...FJSS ... See full document
13
Optimization of Job Scheduling in Flow Shop Environment using Genetic Algorithm Considering Sequence Dependent Setup Times
... production scheduling problems, job shop scheduling is one of the strong NP-complete combinatorial optimization ...coded job-based representation can be used to guarantee the ... See full document
5
A review of scheduling problem and resolution methods in flexible flow shop Pages 67-88 Download PDF
... two criteria which are the product variety and production ...The setup time is included into total makespan and queuing time of the product, and hence it plays an important role in the optimization ... See full document
22
"ON SPECIALLY STRUCTURED TWO STAGE FLOW SHOP SCHEDULING PROBLEM WITH SETUP TIME SEPARATED FROM PROCESSING TIME AND JOBS IN A STRING OF DISJOINT JOB BLOCKS "
... classical job shop scheduling problem n-jobs are processed on m-machines and the order of processing each job through machines is ...in job shop scheduling problems ... See full document
10
A heuristic algorithm for scheduling in a flow shop environment to minimize makespan Pages 173-184 Download PDF
... the makespan, total waiting time and total tardiness in a flow shop consisting of n jobs and m ...flow shop scheduling problem with setup and assembly ...flow shop ... See full document
12
A New Multi-objective Job Shop Scheduling with Setup Times Using a Hybrid Genetic Algorithm
... multi-objective job shop scheduling with sequence-dependent setup ...the makespan and sum of the earliness and tardiness of jobs in a time ...a job ... See full document
12
Multi-criteria sequence-dependent single machine scheduling using genetic and simulated annealing algorithms
... these setup times, and decision makers must therefore organize the job scheduling on this single machine by trying to minimize downtime while respecting the different deadlines ...[1]. ... See full document
6
A bi-objective model for the assembly flow shop scheduling problem with sequence dependent setup times and considering energy consumption
... in scheduling problems is concerned with the minimization of a single ...1980s, scheduling researches were mainly concentrated on optimizing single performance measures such as makespan (C max ), ... See full document
19
Bi-objective scheduling for the re-entrant hybrid flow shop with learning effect and setup times
... ow shop problem with several useful ...waiting times between every two successive operations, unrelated parallel machines at least one stage, sequence/machine dependent setup ... See full document
21
A hybrid algorithm for flexible job-shop scheduling problem with setup times
... Abstract: Job-shop scheduling problem is one of the most important fields in manufacturing optimization where a set of n jobs must be processed on a set of m specified ...Each job ... See full document
8
Pareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times
... each job is scheduled only once and processed by one ...each job (but not the last scheduled job) must come immediately before, and each job (but not the first scheduled job) must come ... See full document
7
Practical Approaches for Solving the Runway Scheduling Problem – The Departure Case.
... each job be assigned? For the second decision, a simple answer would be to assign the jobs based on their release dates (for example if the first group contains k jobs, assign k jobs with the smallest release time ... See full document
111
Tabu search method for solving multiobjective job shop scheduling problem
... of scheduling can be seen on scheduling of jobs in factories and companies and also scheduling employee work hours (Pedersen, ...of job shop scheduling in real ...in ... See full document
28
Multi-Objective for a Partial Flexible Open Shop Scheduling Problem using Hybrid Based Particle Swarm Algorithm and Ant Colony Optimization
... open-shop scheduling problem (PFOSP), this paper optimizes the three objectives of minimizing the makespan, the maximum workload and the total workload of machine, Methods and ... See full document
8
Related subjects