• No results found

multi-mode project scheduling problem

Project Scheduling Problem Constrained by Flexible Resource with Capability Difference

Project Scheduling Problem Constrained by Flexible Resource with Capability Difference

... assignment problem (RCJAP), proposed heuristics algorithm to get lower bound of problem and analyzed value of flexible resource ...addressed multi-skill project scheduling ...

6

An Annealed Genetic Algorithm for Multi Mode Resource Constrained Project Scheduling Problem

An Annealed Genetic Algorithm for Multi Mode Resource Constrained Project Scheduling Problem

... CONCLUSION In this paper a novel approach of hybridizing simulated annealing and genetic algorithm is proposed to solve multi mode resource constrained project scheduling problem.. Paper[r] ...

7

A New Bi-Objective Model for a Multi-Mode Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and four Payment Models

A New Bi-Objective Model for a Multi-Mode Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and four Payment Models

... resource problem) that was first introduced by Russel, et al [4], maximize discounted cash flow (resource- constrained problem) [5,6], minimize the total (weighted) resource consumption [7], and maximize ...

14

Combining Monte Carlo and hyper heuristic methods for the multi mode resource constrained multi project scheduling problem

Combining Monte Carlo and hyper heuristic methods for the multi mode resource constrained multi project scheduling problem

... These instances have been studied in various works. [49] used a Genetic algorithm and also Forward-Backward Iterations (FBI) [34] along with a simple method to repair infeasible mode choices. [9] again used FBI ...

37

Multi-Mode Resource-Constrained Project-Scheduling Problem With Renewable Resources:  New Solution Approaches

Multi-Mode Resource-Constrained Project-Scheduling Problem With Renewable Resources: New Solution Approaches

... this problem heuristically, two decisions are involved – (i) which activity to be assigned if two or more activities are precedence and resource feasible and (ii) which of the several feasible modes of execution ...

14

Evolutionary Algorithm for Solving Multi Mode Resource Constrained Project Scheduling Problems through Deterministic Mode Selection

Evolutionary Algorithm for Solving Multi Mode Resource Constrained Project Scheduling Problems through Deterministic Mode Selection

... solve multi-mode resource- constrained project scheduling ...as problem solving technique for the MRCPSP by generating competitive results for the j30 PSPLIB ...deterministic ...

6

Solving a new multi-objective resource constrained project scheduling problem by SAICA and compare it with DE method

Solving a new multi-objective resource constrained project scheduling problem by SAICA and compare it with DE method

... Constrained Project Scheduling Problem (RCPSP) has triggered a substantially significant issue among scheduling ...new multi-objective mathematical model for multi-mode ...

37

Optimization of Time, Cost, and Quality in Critical Chain Method Using Simulated Annealing    (RESEARCH NOTE)

Optimization of Time, Cost, and Quality in Critical Chain Method Using Simulated Annealing (RESEARCH NOTE)

... determining project buffer size in critical chain ...the project completion time, uncertainty and ambiguity of plans should be taken into consideration in assessing buffer size ...in ...

9

A. Stochastic Scheduling

A. Stochastic Scheduling

... reactive scheduling has been thoroughly studied in the production scheduling ...reactive scheduling in the Multi-Mode Resource Constrained Project Scheduling ...

6

An Integrated Simulation Genetic Algorithm for the Stochastic Multi Mode Resource Constrained Project Scheduling Problem

An Integrated Simulation Genetic Algorithm for the Stochastic Multi Mode Resource Constrained Project Scheduling Problem

... the project data is adapted by preprocessing in order to reduce the search ...a mode is non-executable if its execution would violate the renewable or nonrenewable resource constraints in any ...A ...

7

Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)

Resource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)

... involves scheduling of project activities such that not only the makespan of the project does not exceed a given due date, but also the total material holding and ordering cost is minimized, while ...

7

SECURE ROUTING IN MANET USING ASYMMETRIC GRAPHS

SECURE ROUTING IN MANET USING ASYMMETRIC GRAPHS

... the multi-attribute tradeoff optimization of critical chain multi-project scheduling (CCMPS), multi-attribute utility function was adopted to conduct comprehensive optimization of time, ...

9

Weighted Multi Skill Resources Project Scheduling

Weighted Multi Skill Resources Project Scheduling

... The problem with these indicators is that a meta-heuristic that does nothing, is classified, and there is no notion of the worst value that can be ...instance problem, and in other instance the ...

6

Integrated Multi project Scheduling and Worker Allocation for the Assembly of Steam Turbines

Integrated Multi project Scheduling and Worker Allocation for the Assembly of Steam Turbines

... decision problem is to determine the sequence of tasks and allocate the workers to the activity step in a multi-project environment in order to minimize the maximum completion time, ...nature, ...

6

A Genetic Algorithm for Resource Contrained Project Scheduling Problem

A Genetic Algorithm for Resource Contrained Project Scheduling Problem

... The algorithm solves each one of the instances with a maximum number of 1,000 schedules, computed as terminating condition. To study the performance of the algorithm different problem set instances were solved ...

6

Bio-Soft Computational and Tabu Search Methods for Solving a Multi-Task Project Scheduling Problem

Bio-Soft Computational and Tabu Search Methods for Solving a Multi-Task Project Scheduling Problem

... by project workers who have different scheduling ...of project scheduling, which is commonly called multi-task project scheduling, deals with hired pro- ject workers who ...

8

Real-Time Scheduling of Flexible Manufacturing Systems Using Support Vector Machines and Case-Based Reasoning

Real-Time Scheduling of Flexible Manufacturing Systems Using Support Vector Machines and Case-Based Reasoning

... for scheduling using SVMs and case-based reasoning is proposed in this ...knowledge-based scheduling system is shown to provide the lowest mean tardiness and mean flow time ...

6

Algorithm for complete enumeration based on a stroke graph to solve the supply network configuration and operations scheduling problem

Algorithm for complete enumeration based on a stroke graph to solve the supply network configuration and operations scheduling problem

... Design/methodology/approach: To achieve this objective, the supply chain network configuration and operations scheduling problem is presented. A model based on stroke graphs allows the design of an ...

17

An Improved Genetic Algorithm for Resource Constrained Project Scheduling Problem

An Improved Genetic Algorithm for Resource Constrained Project Scheduling Problem

... Forward/Backward scheduling local search ...RCPSP problem into smaller problems and obtained the solution for the problem by combining the solution of sub ...

6

An Exact Bidirectional Approach to the Resource Constrained Project Scheduling Problem

An Exact Bidirectional Approach to the Resource Constrained Project Scheduling Problem

... the problem in a direct way. More precisely, I realized that the problem could be modeled as a shortest path problem between two nodes of a ...a multi-directional, approach to the ...

261

Show all 10000 documents...

Related subjects