• No results found

[PDF] Top 20 Pareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times

Has 10000 "Pareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times" found on our website. Below are the top 20 most common "Pareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times".

Pareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times

Pareto-based Multi-criteria Evolutionary Algorithm for Parallel Machines Scheduling Problem with Sequence-dependent Setup Times

... 3. 1. Chromosome Representation Chromosome representation determines how the problem is structured in the GA. For representing chromosomes, we use binary coding. Chromosomes are made of zero-one genes. Genes ... See full document

7

Solving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization

Solving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization

... UPMs scheduling problem with sequence-dependent setup times, non- identical due dates, ready times and precedence relations to minimize the number of tardy jobs and the ... See full document

10

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints

Multi-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints

... novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all ...model, machines are considered ... See full document

10

A hybrid algorithm for flexible job-shop scheduling problem with setup times

A hybrid algorithm for flexible job-shop scheduling problem with setup times

... Job-shop scheduling problem is one of the most important fields in manufacturing optimization where a set of n jobs must be processed on a set of m specified ...Shop problem (FJSP) is a ... See full document

8

Estimation of Heuristics for adaptation Flow Shops and Flow Shops with sequence Dependent Setup Times (SDST)

Estimation of Heuristics for adaptation Flow Shops and Flow Shops with sequence Dependent Setup Times (SDST)

... (SA) algorithm, based on the equivalence of annealing process of metals, was worked on by Osman and Potts ...SA based heuristic algorithms for the PFSP and proved that their algorithm offers ... See full document

7

A bi-objective model for the assembly flow shop scheduling problem with sequence dependent setup times and considering energy consumption

A bi-objective model for the assembly flow shop scheduling problem with sequence dependent setup times and considering energy consumption

... job-shop scheduling problem. They also developed a heuristic algorithm to identify a good solutions for the model based on the “Tabu search mechanism” (He, Liu, Cao, & Li, ... See full document

19

A Mathematical Model of a Multi-Criteria Parallel Machine Scheduling Problem: a Genetic Algorithm (RESEARCH NOTE)

A Mathematical Model of a Multi-Criteria Parallel Machine Scheduling Problem: a Genetic Algorithm (RESEARCH NOTE)

... of scheduling researches assume that setup times are negligible or part of the processing ...of setup [5]. By knowing that the scheduling of independent jobs with a common due date on a ... See full document

8

The Problem of Scheduling in Parallel Machines: A Case Study

The Problem of Scheduling in Parallel Machines: A Case Study

... this problem hasn’t permitted to find one solution using optimising methods and so the authors have developed a heuristic based on the simulated annealing algorithm which allows obtaining ... See full document

6

Multi-criteria sequence-dependent single machine scheduling using genetic and simulated annealing algorithms

Multi-criteria sequence-dependent single machine scheduling using genetic and simulated annealing algorithms

... machine scheduling problem with jobs due on different days, multiple criteria and sequence-dependent setup ...The problem is even more complex because businesses often ... See full document

6

Multi-objective sequence dependent setup times hybrid flowshop scheduling: A literature review

Multi-objective sequence dependent setup times hybrid flowshop scheduling: A literature review

... of machines with minimum makespan. Johnson algorithm [102] was used and a simple constructive heuristic algorithm was ...simple algorithm named as restarted iterated Pareto greedy ... See full document

53

A New ILP Model for Identical Parallel-Machine Scheduling with Family Setup Times Minimizing the Total Weighted Flow Time by a Genetic Algorithm

A New ILP Model for Identical Parallel-Machine Scheduling with Family Setup Times Minimizing the Total Weighted Flow Time by a Genetic Algorithm

... identical parallel-machine scheduling problem with sequence-dependent setup times and release dates to minimize the total completion ...subset based on this ... See full document

12

A Linear Programming Approach for Parallel Cell Scheduling with Sequence Dependent Setup Times

A Linear Programming Approach for Parallel Cell Scheduling with Sequence Dependent Setup Times

... the problem of scheduling on parallel machines in which the setup time is sequence- ...the problem as an integer program and for the general cases they developed a hybr- ... See full document

9

Job-Shop Scheduling Problem With Sequence Dependent Setup Times

Job-Shop Scheduling Problem With Sequence Dependent Setup Times

... on scheduling assume setup times negligible or as a part of the processing ...shop scheduling with sequence dependent setup times is ...the problem, a ... See full document

7

A Mathematical Model for the Single Machine Scheduling Considering Sequence Dependent Setup Costs and Idle Times

A Mathematical Model for the Single Machine Scheduling Considering Sequence Dependent Setup Costs and Idle Times

... the scheduling of multiple products on a single machine with sequence dependent setup times and ...production sequence can decrease total costs (including setup costs, ... See full document

9

Practical Approaches for Solving the Runway Scheduling Problem – The Departure Case.

Practical Approaches for Solving the Runway Scheduling Problem – The Departure Case.

... The problem of operating the runway efficiently is challenging and there are many issues that cause ...aircraft based on their size and type of operation. Because of the sequence dependency involved, ... See full document

111

Single Machine Scheduling with Time Dependent Learning Effect and Non Linear Past Sequence Dependent  Setup Times

Single Machine Scheduling with Time Dependent Learning Effect and Non Linear Past Sequence Dependent Setup Times

... the problem to minimize the total weighted completion time, we show that an optimal solution if the processing times and the weights are agreeable, ... See full document

6

Unrelated Parallel Machines Scheduling with the Effect of Aging and Learning under Multi Maintenance Activities

Unrelated Parallel Machines Scheduling with the Effect of Aging and Learning under Multi Maintenance Activities

... require multi-maintenance activities to improve its production efficiency or product ...The problem of joint scheduling and maintenance has become a popular topic and has received the attention of ... See full document

7

Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups

Finite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups

... lot-scheduling problem (ELSP). Original ELSP concerns with lot sizing and scheduling of several items in a single stage production facility, so that corresponding demands are met without shortage, ... See full document

16

A New Multi Objective Genetic Algorithm for Use in Investment Management

A New Multi Objective Genetic Algorithm for Use in Investment Management

... A known drawback of this method is the multitude of trials that must be performed, corresponding to different values of in the interval [0,1]. This requires substantial computing effort. Fig. 1 to Fig. 5 show the ... See full document

8

Multi-objective optimisation using learning automata and its applications in power systems

Multi-objective optimisation using learning automata and its applications in power systems

... • Recently, a Group Search Optimiser (GSO) was developed at the University of Liverpool [56], which was inspired by animal searching behaviour and group living theory [57]. The strategies of information-sharing [58] and ... See full document

235

Show all 10000 documents...